EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
nburkholder
-
Listing for Category : firewall
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (334)
Research
Workshop
- (5)
Empennage
- (49)
Fuselage
- (131)
Firewall
- (10)
Tail Feathers
Wings
- (32)
Controls
- (1)
Avionics
- (25)
Lighting
- (2)
Instrument Panel
- (8)
Landing Gear
- (8)
Engine
- (36)
Propeller
- (2)
Fuel System
Interior Finish
Paint / Decals
Inspection
- (2)
Tools
Wiring
- (23)
Builder Name:
Nancy Burkholder
-
Project:
Vans - RV-9
-
VIEW REPORTS
Total Hours:
1181.4
Total Flight Time:
Total Expense:
$2.00
Start/Last Date:
May 14, 2022 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=nburkholder
Home or Last Project Picture
Oct 09, 2023
Rivet Firewall Recess to Firewall
- (1.5 hours)
Category: Firewall
Rivet Firewall Recess to Firewall
IMG_9486.jpeg
Oct 07, 2023
Mount ANL fuse block
- (2 hours)
Category: Firewall
Mount the 60A ANL fuse block to the firewall. Fabricate and install #4 wire between the fuse block and master solenoid.
IMG_9482.jpeg
IMG_9483.jpeg
Sep 30, 2023
Mount manifold and terminal block
- (4 hours)
Category: Firewall
Move sensor manifold on firewall to align with center rib for added stiffness. Mount terminal block to firewall. Terminate sensor wiring from EMS at terminal block.
IMG_9443.jpeg
Aug 05, 2023
A few wires
- (1 hour)
Category: Firewall
Attach master solenoid coil wire and primary bus power to cockpit. File the split rocker switch opening to 1.25" tall.
IMG_9208.jpeg
IMG_9209.jpeg
Aug 04, 2023
Primary Battery grounding strp
- (.5 hour)
Category: Firewall
Attach ring terminal to grounding strap and attach strap to firewall and primary battery
IMG_9207.jpeg
Jul 27, 2023
Add aircraft ground
- (2 hours)
Category: Firewall
Create battery ground to aircraft frame on firewall for primary and secondary batteries. Need to install a ring terminal on the ground braid to the primary battery.
IMG_9173.jpeg
IMG_9174.jpeg
IMG_9175.jpeg
Jul 09, 2023
Add penetrations for cabling and vacuum line
- (4 hours)
Category: Firewall
Add firewall penetrations for vacuum line, sensor wiring, LIghspeed Ignition trigger wires, and cockpit power.
IMG_9116.jpeg
IMG_9118.jpeg
Apr 29, 2023
Install copper bus bar
- (1 hour)
Category: Firewall
Fabricate and install copper bus bar connecting master contactor and starter solenoid.
IMG_8650.jpeg
Apr 28, 2023
Mount heat control cable and electrical components
- (10 hours)
Category: Firewall
Drill firewall heater control cable penetration and mount the fitting and cable. Create doubler plate to mount the master contactor and starter solenoid to firewall. Add nut plates to firewall and firewall stiffener angles, and mount components.
IMG_8647.jpeg
IMG_8646.jpeg