Project: nburkholder   -  
            Listing for Category : firewall
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Nancy Burkholder   -  
Project:   Vans - RV-9   -   VIEW REPORTS
Total Hours:1181.4
Total Flight Time:
Total Expense:$2.00
Start/Last Date:May 14, 2022 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=nburkholder

Home or Last Project Picture

Oct 09, 2023     Rivet Firewall Recess to Firewall - (1.5 hours)       Category: Firewall
Rivet Firewall Recess to Firewall


 
Oct 07, 2023     Mount ANL fuse block - (2 hours)       Category: Firewall
Mount the 60A ANL fuse block to the firewall. Fabricate and install #4 wire between the fuse block and master solenoid.


 
Sep 30, 2023     Mount manifold and terminal block - (4 hours)       Category: Firewall
Move sensor manifold on firewall to align with center rib for added stiffness. Mount terminal block to firewall. Terminate sensor wiring from EMS at terminal block.


 
Aug 05, 2023     A few wires - (1 hour)       Category: Firewall
Attach master solenoid coil wire and primary bus power to cockpit. File the split rocker switch opening to 1.25" tall.


 
Aug 04, 2023     Primary Battery grounding strp - (.5 hour)       Category: Firewall
Attach ring terminal to grounding strap and attach strap to firewall and primary battery


 
Jul 27, 2023     Add aircraft ground - (2 hours)       Category: Firewall
Create battery ground to aircraft frame on firewall for primary and secondary batteries. Need to install a ring terminal on the ground braid to the primary battery.


 
Jul 09, 2023     Add penetrations for cabling and vacuum line - (4 hours)       Category: Firewall
Add firewall penetrations for vacuum line, sensor wiring, LIghspeed Ignition trigger wires, and cockpit power.


 
Apr 29, 2023     Install copper bus bar - (1 hour)       Category: Firewall
Fabricate and install copper bus bar connecting master contactor and starter solenoid.


 
Apr 28, 2023     Mount heat control cable and electrical components - (10 hours)       Category: Firewall
Drill firewall heater control cable penetration and mount the fitting and cable. Create doubler plate to mount the master contactor and starter solenoid to firewall. Add nut plates to firewall and firewall stiffener angles, and mount components.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.