EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
nburkholder
-
Listing for Category : Show all entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (334)
Research
Workshop
- (5)
Empennage
- (49)
Fuselage
- (131)
Firewall
- (10)
Tail Feathers
Wings
- (32)
Controls
- (1)
Avionics
- (25)
Lighting
- (2)
Instrument Panel
- (8)
Landing Gear
- (8)
Engine
- (36)
Propeller
- (2)
Fuel System
Interior Finish
Paint / Decals
Inspection
- (2)
Tools
Wiring
- (23)
Builder Name:
Nancy Burkholder
-
Project:
Vans - RV-9
-
VIEW REPORTS
Total Hours:
1181.4
Total Flight Time:
Total Expense:
$2.00
Start/Last Date:
May 14, 2022 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=nburkholder
Home or Last Project Picture
May 14, 2024
More Canopy Track Attachment
- (3 hours)
Category: Fuselage
Fabricate two new spacers to fit under the rear screw holding the canopy rail to the fuselage. The plans call for 1/8" thick shim but 3/16" completely fills the gap nicely. Fabricate two tools to facilitate attaching nuts and washers to the screws that hold the canopy rail to the fuselage. There is a large lip un the underside of the canopy attach stringer that obstructs access to the screw. One tool holds a nut and washer to a fixture that can be inserted into the slot and into position to engage the screw. The second tool provides an offset drive to a socket that allows the socket to engage the nut and the socket drive is offset to pass through the slot. Tried both tools on one screw and they worked acceptably.
Measured and ordered longer rivets and screws to attach the canopy rails and Supertrack rails to the F-705 builkhead assembly.
IMG_0389.jpg
IMG_0390.jpg
May 13, 2024
Rivet F-705 Bullkhead Assembly to Fuselage
- (2 hours)
Category: Fuselage
Rivet on left fuselage at junction with F-705 Bullkhead Assembly. Some rivets not set by quickbuild: skin to longeron and longeron toF-705 Bullkhead Assembly. Countersink the canopy slide rail and match drill to fuselage at the forward attach screw. Drill some screw attachments for left and right side canopy roller tracks.
May 12, 2024
Rivet F-705 Bullkhead Assembly and Skins to Longeron
- (2 hours)
Category: Fuselage
Add rivets to right side fuselage at rearF-705 Bullkhead Assembly that were not set by quckbuild: longeron to skin and F-705 Bullkhead Assembly to longeron. Need to order some longer rivets to complete all missing rivets.
May 11, 2024
Replace Mixture Control Lever and Cable Mount
- (3 hours)
Category: Engine
Exchanged the mixture control lever replacing a lever with an offset to one without the offset to eliminate any potential interference with the cowl. This moved the cable position inboard about 1" necessitating making a new cable attach bracket. Remove riveted on old bracket, fabricate a new bracket, and rivet bracket to engine mounted bracket. Clock the lever to enable the full range of motion from idle cutoff to full rich. Verify the cable moves freely through the range of motion.
IMG_0379.jpg
IMG_0380.jpg
IMG_0381.jpg
IMG_0382.jpg
IMG_0383.jpg
May 10, 2024
Vist with Technical Advisor
- (1 hour)
Category: Inspection
Mike Hilger came by and I showed him the progress since last August; mounted engine and landing gear, mounted 4 into 1 exhaust system, mounted oil cooler, and right wing repair.
May 10, 2024
Test Fuel Tank
- (1.5 hours)
Category: Wings
Create manometer to measure air pressure in fuel tank. Attach manometer tubing to fuel tank vent. Attach tire valve insert in fuel drain port. Cover fuel cap with packing tape. Pressurize tank to about 24" water height. Detected leak in lower aft corner.
IMG_0376.jpg
IMG_0378.jpg
May 05, 2024
Attach and Seal Right Wing Inboard Fuel Tank Rib
- (2 hours)
Category: Wings
Apply Proseal to rivet line at inboard rib. Slide rib into place and cleco. Rivet rib to wing skins and tank baffle. Spread Proseal on wing attach angle reinforcement plate and corresponding rib site. Rivet wing attach angle and reinforcement plate. Apply proseal to fuel tank vent passthrough fitting and attach fitting to vent line. Spread Proseal around rib perimeter and perimeter of access hatch reinforcement ring. Clean Proseal from tools..
IMG_0371.jpg
May 04, 2024
Right Wing Inboard Rib
- (10 hours)
Category: Wings
Drill out rivets in the right wing inboard fuel tank rib. Soften Proseal with MEK, cut Proseal with a utility knife, and extract rib. Clean Proseal from wing skin. Retrieve wing attach bracket and fuel vent feedthrough fitting. Trim attach angle reinforcement plate per drawing. Match drill rib and reinforcement plate to existing holes in attach angle. Cut 5 1/4" diameter hole in rib using a fly cutter. Lay out holes using the existing cover plate to establish desired orientation. Drill rib for nutplates. Machine countersink the cover plate reinforcement plate and dimple the rib Rivet the nutplates to the rib.
IMG_0354.jpg
IMG_0355.jpg
IMG_0357.jpg
IMG_0359.jpg
IMG_0361.jpg
IMG_0362.jpg
IMG_0363.jpg
IMG_0365.jpg
IMG_0366.jpg
IMG_0367.jpg
May 01, 2024
Fabricate Canopy Slider Track
- (2.5 hours)
Category: Fuselage
Drill the canopy track spacer for rivet and attach screws. Cut and bend the canopy track rail to fit the spacer. Match drill the rail to the spacer, machine countersink the rivet locations top and bottom, and rivet the rail to the spacer. Cleco the canopy track to the fuselage and verify fit.
IMG_0349.jpg
IMG_0350.jpg
IMG_0352.jpg
Apr 30, 2024
Bend Canopy Slide Spacer
- (1 hour)
Category: Fuselage
Received RV-8 canopy slide spacer from Vans. The forward bend is not correct for the RV-9. Bend the spacer to match the RV-9 spacer using a c clamp as an mandrel.
IMG_0347.jpg
IMG_0348.jpg
Apr 30, 2024
Verify Rubber Baffle Fitment at Cowl
- (.3 hour)
Category: Engine
Attach lower cowl and verify placement of the rubber baffle between the filter air box snorkel and the lower cowl air inlet.
IMG_0342.jpg
IMG_0344.jpg
Apr 30, 2024
Mount Nutplates to Lower Cowl
- (1.5 hours)
Category: Fuselage
Mount the upper and lower cowls. Match drill 6 holes for #10 screws attaching the upper and lower cowls behind the propeller spinner. Drill and machine countersink for floating nutplates. Rivet nutplates.
IMG_0345.jpg
IMG_0346.jpg
Apr 28, 2024
Add Filter Air Box Baffle
- (1.5 hours)
Category: Engine
Add silicone rubber baffling to the filter air box snorkel to lower cowl air inlet.
IMG_0340.jpg
Apr 28, 2024
Move Oil Cooler Right 3/4"
- (2 hours)
Category: Engine
Need to move the firewall mounted oil cooler left 5/8" to increase spacing with the mechanical fuel pump exit port. Fabricate a new and longer aluminum angle that mounts to the firewall to support the oil cooler aft mount tabs. This is a tedious location for mounting because the engine mount hinders access to the attaching hardware. Ultimately persevered and the cooler is hopefully mounted with sufficient clearance with the fuel pump. Right picture shows before moving and the left picture after moving oil cooler.
IMG_0339.jpg
IMG_0333.jpg
Apr 28, 2024
Fasten Aluminum Backing Tabs to Front Lower Cowl
- (1 hour)
Category: Fuselage
Match drill the front top and bottom cowl behind the propeller spinner for three screws on the left and right sides. Remove the top cowl and fabricate aluminum tabs to reinforce where nutplates will be mounted for the screws. Epoxy the tabs to left and right side. Remove the lower cowl and set aside to allow the epoxy to cure.
IMG_0334.jpg
IMG_0335.jpg
Apr 27, 2024
Lower Cowl Skybolts and Rivets
- (4 hours)
Category: Fuselage
Remove upper and lower cowl. Using a pneumatic riveter with a very narrow jaw. finish riveting the horizontal cowl lower attach plates for rivets that could not be reached with a stock riveter due to the close clearance between the firewall attach point and the engine mount. Rivet Skybolt receptacles to the flanges on the lower cowl at the vertical firewall joint on the right and left sides. Drill the cowl for grommets, attach grommets, and insert studs. Fit cowl lower and upper cowl. Adjust stud depth for a few studs that were not set for the correct depth. Note the clearance between the lower cowl and the filter air box snorkel. I believe this location is ready for installation of rubber baffling.
IMG_0325.jpg
IMG_0326.jpg
IMG_0327.jpg
IMG_0328.jpg
IMG_0329.jpg
IMG_0330.jpg
IMG_0331.jpg
IMG_0332.jpg
Apr 24, 2024
Mount Skybolts at Right Cowl Horizontal Split Line
- (2.5 hours)
Category: Fuselage
Rivet flanges to lower cowl. Rivet receptacles to flanges. Mark Skybolt hole locations on upper cowl, drill, and attach grommets and studs. Verify cowl fit and adjust several Skybolts for correct depth.
IMG_0317.jpg
IMG_0318.jpg
Apr 23, 2024
Prepare Skybolt Flanges for Right Cowl Split LIne
- (3 hours)
Category: Fuselage
Mount Skybolt flanges to the lower cowl at the right horizontal split line. Match drill the flanges to the cowl. Deburr, machine countersink, and prime the flanges. Machine countersink the lower cowl.
IMG_0310.jpg
IMG_0311.jpg
IMG_0312.jpg
IMG_0313.jpg
Apr 21, 2024
Attach Skybolt Flanges to Lower Cowl Horizontal Split LIne
- (3 hours)
Category: Fuselage
Rivet Skybolt flanges to left side of lower cowl at the horizontal split line. Match drill the upper cowl to the Skybolt flanges. Drill upper cowl to accept grommets. Install studs and attach the upper and lower cowl along the left horizontal split line and along the firewall. Pull pins on the receptacles to lock the receptacles in place.
IMG_0301.jpg
IMG_0303.jpg
IMG_0304.jpg
IMG_0305.jpg
IMG_0306.jpg
Apr 20, 2024
Prepare Skybolts Along Left Horizontal Cowl Split Line
- (3 hours)
Category: Fuselage
Mount flanges to the lower cowl along the horizontal split line. Match drill the attaching rivets using a rivet fan. Deburr, machine countersink, and prime flanges. Machine countersink the lower cowl.
IMG_0295.jpg
Apr 20, 2024
Install Skybolts on Upper Cowl at Firewall
- (2 hours)
Category: Fuselage
Drill remaining upper cowl at firewall to accept grommets.
IMG_0297.jpg
IMG_0298.jpg
Apr 19, 2024
Trim Lower Cowl Horizontal Split LIne
- (3 hours)
Category: Fuselage
Trim lower cowl horizontal split line. The left horizontal split line has sufficient clearance with the upper cowl. The right horizontal split line needs some additional trimming towards the aft and at the nose.
IMG_0289.jpg
IMG_0290.jpg
Apr 18, 2024
Trim Upper Cowl and Install Skybolt
- (3 hours)
Category: Fuselage
Install 5 Skybolt receptacles and grommets. Trim the upper cowl horizontal split line.
IMG_0283.jpg
IMG_0291.jpg
Apr 15, 2024
Upper Cowl Oil Door
- (2 hours)
Category: Fuselage
Cut out oil door in upper cowl. Attach upper cowl to firewall fuselage with Skybolt cleco adapters. Identify trimming of the upper fuselage and verify vertical placement of the horizontal Skybolt flanges on the right side.
IMG_0275.jpg
Apr 14, 2024
Lower Cowl Attachment
- (3 hours)
Category: Fuselage
Rivet lower cowl attachment plates to fuselage and match drill plate nuts to cowl. Not all rivets set due to not having a suitable bucking bar for close clearance with engine mount. Match drill lower cowl right vertical Skybolt cleco adapters to cowl.
IMG_0272.jpg
IMG_0273.jpg
IMG_0274.jpg
Apr 13, 2024
Lower Cowl Fuselage Attachment
- (5 hours)
Category: Fuselage
Fabricate two lower cowl bottom attach plates. Apply primer and ready to rivet to fuselage. Rivet the right side lower cowl flanges to the fuselage.
IMG_0266.jpg
IMG_0267.jpg
Apr 12, 2024
Fitting Cowl with Skybolts
- (5 hours)
Category: Fuselage
Match drill the remaining upper cowl Skybotts to the bushings in the flanges. Fit the lower cowl and match drill the side Skybolts to the bushings mounted in the flanges.
IMG_0259.jpg
IMG_0261.jpg
IMG_0262.jpg
IMG_0263.jpg
IMG_0264.jpg
Apr 05, 2024
Drill Locating Holes for Cowl Skybolt Studs
- (6 hours)
Category: Fuselage
Sand and apply second layer of epoxy with filler to the outside lower cowl exhaust outlet. Mount Skybolt flanges to upper cowl firewall. Tape 10 Skybolt cleco drill bushings to the flanges working from the center flange to the left and right side. Place and level upper cowl. From under the cowl shine a flashlight through each cleco drill bushing hole and mark the light spot seen on the outside of the cowl. Drill #40 and then #30 to align the cowl hole with the hole in the busing. Drill 13 of 17 upper firewall Skybolt flanges.
IMG_0254.jpg
Mar 30, 2024
Prime Skybolt Flanges
- (3 hours)
Category: Fuselage
Scuff Skybolt flange surfaces with Scotch Brite pads, wipe with MEK cloth, and apply primer to the flanges. Apply Proseal to the left and right vertical firewall seams with the fuselage skin.
IMG_0242.jpg
IMG_0241.jpg
Mar 30, 2024
Mount the exhaust hangers
- (1 hour)
Category: Engine
Mount the exhaust hangers from the engine mount with Adel clamps and stainless steel hose clamps to the 4 into 1 collector.
IMG_0243.jpg
Mar 30, 2024
Mount Oil Cooler
- (1 hour)
Category: Engine
Attach oil cooler to mounting angle on firewall and Adel clamps on the engine mount. The mount is sturdy but not easy to attach. The clearance between the oil cooler fitting and fuel pump fitting is close.
IMG_0244.jpg
IMG_0245.jpg
Mar 24, 2024
Mount Lower Cowl Vertical Skybolt Flanges
- (3 hours)
Category: Fuselage
Lay out the location for Skybolt fasteners on the left and right lower cowl vertical firewall attach points, clamp the flanges to the fuselage, and match drill to the vertical firewall rivet locations. Remove the flanges, deburr drilled holes, machine countersink the rivet attach holes and the Skybolt fastener holes, and remount the flanges to the vertical firewall.
IMG_0229.jpg
IMG_0230.jpg
Mar 24, 2024
Supertracks Rear Mount
- (2.5 hours)
Category: Fuselage
Fabricate two threaded spacers to support the aft ends of the Supertracks. Fabricate the spacers from 1/2" aluminum bar stock. Use metal lathe to cut spacers slightly long and then face off the ends flat to the desired length. Center drill the spacers and tap for 10-32 threads.
IMG_0212.jpg
IMG_0228.jpg
Mar 23, 2024
Prepare Upper Cowl Skybolt Flanges
- (5 hours)
Category: Fuselage
Verify fuselage level orientation. Determine approximate horizontal cowl split line. Lay out Skybolt flange locations on upper firewall. Mount and drill Skybolt flanges to the firewall upper cowl. Remove, deburr, machine countersink, and remount flanges flanges.
IMG_0222.jpg
IMG_0226.jpg
IMG_0227.jpg
Mar 22, 2024
Trim and Fit Upper and Lower Cowl
- (4 hours)
Category: Fuselage
Mount lower and upper cowl and trim lower cowl to fit. Mount top cowl, mark spots that need trimming, remove cowl, trim, and remount. Repeat until the cowl fits reasonably well. Begin working through how to mount the Skybolt flanges.
IMG_0214.jpg
IMG_0215.jpg
IMG_0217.jpg
IMG_0218.jpg
IMG_0219.jpg
Mar 19, 2024
Mount Super Tracks, Lower Cowl
- (4 hours)
Category: Fuselage
Apply second layer of fiberglass to lower engine cowl exhaust exit. Drill Super Tracks mounting holes and fabricate four shims. Fabricate tool to enable machine countersinking the forward mounting screw. Match drill the Super Tracks to the fuselage.
IMG_0205.jpg
IMG_0206.jpg
IMG_0207.jpg
IMG_0208.jpg
Mar 17, 2024
Trim heat muff exit port
- (1.5 hours)
Category: Engine
Trim about 5/8" off the right heat muff aft port due to close clearance with the #3 intake manifold. Attach scat tube to the port to verify clearance.
IMG_0189.jpg
IMG_0191.jpg
IMG_0192.jpg
Mar 17, 2024
Canopy Preparation
- (6 hours)
Category: Fuselage
Clamp the sliding canopy track to the longerons and match drill the outer mounting holes. Made a decision to incorporate the Fly Boy's Super Tracks to the canopy build now. Rivet the canopy track extension to the stock track. Notch the canopy tracks at the aft top to allow the canopy rollers to exit the canopy track when sliding the canopy open. Fit the right Super Track in position and bevel the aft end to nestle next to the rear skin.
IMG_0195.jpg
IMG_0196.jpg
IMG_0197.jpg
IMG_0198.jpg
IMG_0199.jpg
IMG_0200.jpg
Mar 17, 2024
Remove Cowl Pipe Mold
- (.5 hour)
Category: Fuselage
Remove the mold used to form the exhaust pipe exit on the lower cowl. Trim the stray fibers and excess fiberglass at the exit.
IMG_0188.jpg
Mar 17, 2024
Filter Air Box Cable
- (1 hour)
Category: Engine
Drill the firewall eyeball pass through to 0.186 to fit the control cable. Add a brass sleeve to the screw that attaches the control cable to the alternate air door.
IMG_0186.jpg
IMG_0187.jpg
Mar 16, 2024
Fabricate Work Stand
- (5 hours)
Category: Workshop
Fabricate an elevated work stand.
IMG_0183.jpg
Mar 16, 2024
Attach Alternate Air Door
- (0.5 hour)
Category: Engine
Apply RTV to the alternate air door frame and rivet frame to air box. Rivet hinge nut plate.
Mar 16, 2024
Fiberglass Cowling At Exhaust Pipe Exit
- (1.5 hours)
Category: Fuselage
Create a mold from a large can wrapped with packing tape. Fit mold to lower cowling with fiber glass mat in place. Cover mat with epoxy resin.
IMG_0179.jpg
IMG_0180.jpg
IMG_0181.jpg
IMG_0182.jpg
Mar 15, 2024
Final Cowl Trim
- (4 hours)
Category: Fuselage
Trim upper and lower cowl to exact firewall clearance. The top cowling ended up with gaps that will need to be filled and shaped. The bottom cowl came out precise with only some light sanding. Cut the clearance relief for the exhaust pipe exit. The cut is ready for fiber glassing the cowling exit channel covering the exhaust pipe.
IMG_0173.jpg
IMG_0172.jpg
IMG_0174.jpg
IMG_0175.jpg
IMG_0176.jpg
IMG_0177.jpg
Mar 14, 2024
Trim Cowl at Firewall
- (3 hours)
Category: Fuselage
Trim upper and lower cowl at the firewall. This is an initial trim that still needs to be precisely matched to the firewall. Verify cowls are level.
IMG_0155.jpg
IMG_0156.jpg
IMG_0160.jpg
IMG_0162.jpg
IMG_0163.jpg
IMG_0165.jpg
IMG_0158.jpg
Mar 13, 2024
Canopy Cowl trim lines
- (1 hour)
Category: Fuselage
Mark firewall trim lines for upper and lower cowling.
Mar 13, 2024
Filter Air Box Alternate Air
- (2 hours)
Category: Engine
Cut 2 11/16" hole in bottom of filter air box for alternate air door. Match drill the door frame to the air box and machine countersink the rivet holes and nut plate holes. Bend door latch to catch door. Parts ready for permanent installation.
IMG_0154.jpg
Mar 12, 2024
Cleco Cowling to Fuselage
- (2 hours)
Category: Fuselage
Add temporary mounting flanges to firewall. Mount cowling, match drill cowling to temporary flanges, and cleco the cowling to the temporary flanges.
IMG_0150.jpg
IMG_0151.jpg
IMG_0152.jpg
Mar 12, 2024
Trial Fit Exhaust to Engine
- (2 hours)
Category: Engine
Received 4 into 1 exhaust. Mount the exhaust system to the engine and verify cowl and filter air box clearances. Overall fit is acceptable except for the heat muff exit is close to the #3 intake manifold. Do not torque installation until further research how to hang rear of exhaust from engine mount and whether to apply never seize compound to slip joints and header mounting studs.
IMG_0144.jpg
IMG_0146.jpg
IMG_0148.jpg
IMG_0149.jpg
Mar 12, 2024
Rivet Filter Air Box to Top Plate
- (1 hour)
Category: Engine
Rivet the top plate to the filter air box. Mount the filter air box to the FI servo and verify the air inlet lines with the cowling air scoop.
IMG_0145.jpg
Mar 08, 2024
Preliminary Cowling Fit
- (3 hours)
Category: Fuselage
Clamp cowling to fuselage and establish the horizontal and vertical placement using a laser level. Mount propeller spinner backplate to propeller and measure distance from propeller mounting flange to rear of spinner.
IMG_0119.jpg
IMG_0124.jpg
IMG_0125.jpg
IMG_0128.jpg
IMG_0129.jpg
Mar 07, 2024
Filter Air Box Fiberglass
- (5 hours)
Category: Engine
Cut sides of filter air box to line with the top plate. Cleco the top plate to the air box. after applying clear packing tape to the top plate.to protect it while glassing in the cut with three layers of fiberglass mat. Over the next three days apply epoxy and mat, sand mat. After fiberglass complete paint the top plate and filter air box.
IMG_0118.jpg
Mar 03, 2024
Fabricate Filtered Box
- (5 hours)
Category: Engine
Attach filter mounting plate to servo and clamp air box filter top plate to mount plate. Install the lower cowl and line the neck of the air box filter top plate with the cowl air scoop horizontally. Trim the neck to achieve 1/4" clearance to the cowl air scoop. Clamp the top plate to the mounting plate to prevent movement, remove both and match drill the mounting plate to the top plate. Install plate nuts and filter retainers on the top plate. Attach the mounting plate to the top plate with bolts and mount the assembly to the servo Mount the lower cowl and check the vertical alignment of the top plate with the top of the air scoop. Flute the top plate to adjust it's height to match. Remove the top plate with attached mounting plate and place the filter between the top plate and the filter air box. With clamps compress the top plate and filter air box about 1/16". The filter air box is ready to drill to the air box.
IMG_0095.jpg
IMG_0096.jpg
Mar 02, 2024
More Cowl to Prop Spinner Clearance Adventures
- (2 hours)
Category: Fuselage
Reviewing my prior measurement of the distance from propeller aft mounting/crankshaft flange to the spinner backing plate I mounted the plate backwards. The spinner backing plate has a 5/8" flange around the circumference for mounting nut plate attaching the spinner. This flange extends 7/16" aft from the aft backing plate mounting surface; 5/8" flange - 1/16" spinner back plate thickness - 1/16" spinner backing plate doubler). The location of the cowl relative to the crankshaft mounting is as follows. 1/4" flywheel thickness, 2" from the propeller aft mounting surface to the spinner backing plate minus 7/16" lip. Set Ez Cowl jig for 1 9/16". This distance is less than the supplied spacer that I used to set the clearance distance. Replace the spacer with the four bolts and locking nuts that hold the jig to the flange. The forward bolt head surface sets the clearance distance. The 1-1/4" bolts I have on hand are barely long enough and 1-3/4" bolts on order.
IMG_0093.jpg
Mar 01, 2024
Mount Aux Generator and Oil Filter
- (1 hour)
Category: Engine
Mount the Monkworks generator to the vacuum pump Accessory Case. Do not torque mounting in case it needs to be removed. Attach the K&R S-15 reusable oil filter. Note location to drill safety wire attach hole. Mount the B&C crank driven alternator.
IMG_0091.jpg
Mar 01, 2024
Trim Lower Cowl
- (2 hours)
Category: Fuselage
Trim the lower cowl to fit around gear legs.
IMG_0082.jpg
IMG_0083.jpg
IMG_0084.jpg
IMG_0085.jpg
IMG_0086.jpg
IMG_0090.jpg
Feb 29, 2024
Attach Nose Bowl Plate to Cowl
- (2 hours)
Category: Fuselage
Determine that the fuselage longerons leveled horizontally are the desired position for mounting the cowl. The engine crank with the attached Ez Cowl Jig is also horizontal. Horizontally center the nose bowl plate on the cowl nose bowl. Vertical center the nose bowl plate and then raise the plate about 1/8" to account for engine mount sag. Match drill and cleco the nose bowl plate to the cowl nose bowl. Place the upper and lower cowl on the Ex Cowl Jig and slide it aft until the lower cowl touches the landing gear legs.
IMG_0078.jpg
Feb 26, 2024
More Cowl Preparaton
- (4 hours)
Category: Fuselage
Fabricate a Lexan nose bowl disk to replace the OSB disk. It's thinner and can be clecoed to the cowl. Raise the tail with a longer upright to get the longerons level. This leveled the rear longeron but upon further consideration I probably want to level the forward longeron. Added center lines to the upper and lower cowl. Modified a rubber plug inserted into the crankshaft to block moisture. The plug was initially slightly too small for a tight fit so I expanded it using a 2" socket as a mandrel and a heat gun. Then I trimmer the outer diameter to the same size as the crank OD. Attached the David Howe Ez Cowl Jig to the crank prop flange.
IMG_0063.jpg
IMG_0064.jpg
IMG_0065.jpg
IMG_0066.jpg
IMG_0067.jpg
IMG_0068.jpg
IMG_0069.jpg
IMG_0070.jpg
Feb 24, 2024
Cowl Preparation
- (3 hours)
Category: Fuselage
Complete research and order Skybolt fasteners for the cowling. Cleco the forward top fuselage skin. Add reference line 2" aft of the firewall in preparation for fitting the cowl. Pilot drill #40 the forward cowl attach screws.
IMG_0055.jpg
IMG_0056.jpg
IMG_0057.jpg
IMG_0058.jpg
IMG_0059.jpg
Feb 23, 2024
Fitting Engine Cowl
- (3 hours)
Category: Fuselage
Grind and fit the flanges mating the upper and lower cowl at the nose bowl.
IMG_0052.jpg
Feb 22, 2024
Spinner Back Plate and Ez Cowl Jig
- (3 hours)
Category: Propeller
Prime spinner back plate and doubler. Rivet doubler to back plate. Mount back plate to propeller hub and measure distance from the aft mounting face to the back plate. Cut out a round disc for use with the Ez Cowl jig.
IMG_0039.jpg
IMG_0047.jpg
IMG_0049.jpg
IMG_0050.jpg
IMG_0051.jpg
Feb 20, 2024
Cut Out Prop Spinner Backplate
- (4 hours)
Category: Propeller
Match drill the propeller spinner doubler plate to the backplate. Cut out the spinner backplate to match the doubler plate.
IMG_0025.jpg
IMG_0026.jpg
Feb 10, 2024
Remake Exhaust Headers
- (6 hours)
Category: Engine
Not satisfied with the clearances and routing, I remade headers 1-3 to provide a more accurate model and to increase the clearance from the cowl. Create construction pictures with design notes, package up the headers for shipping to Airplane Exhaust
IMG_0005.jpg
IMG_9980.jpg
IMG_9982.jpg
IMG_9998.jpg
IMG_0001.jpg
Feb 08, 2024
Final Exhaust Mockup Fitting
- (4 hours)
Category: Engine
Complete gluing and screwing the PVC exhaust pipe mockup. Take additional pictures to document notes and mockup details to be supplied to Airplane Exhaust.
IMG_9930.jpg
IMG_9934.jpg
IMG_9941.jpg
IMG_9942.jpg
Feb 02, 2024
Finish Wiring and Power Up
- (4 hours)
Category: Avionics
Add primary fuse block ground to firewall. Terminate CAN bus at right wing terminal strip. Add 10 ga cross tie wire from secondary fuse block to primary circuit breaker bus via a 20 amp circuit breaker. Install PFD MFD, GTX, GTR, GMA, and GMC units. Apply power and verify all units power up and CAN bus has 0 errors. Roll servo and OAT sensor mounted in right wing were not tested.
IMG_9915.jpg
Jan 30, 2024
Refit #2 and #4 Exhaust Primaries
- (2 hours)
Category: Engine
Replace 1 1/2" PVC on #2 and #4 primaries with 1 1/4" PVC. Confer with Plane Exhaust Corp that they will replace right angle elbows with large radius turns.
IMG_9888.jpg
IMG_9901.jpg
Jan 28, 2024
Mock up #1 and #3 Exhaust Primaries
- (5 hours)
Category: Engine
Mock up #1 and #3 exhaust primaries using only 1 1/4" PVC pipe rather than using 1 1/2" for more complex bends.. Using one size pipe simplifies the fitting. 1 1/4" pipe has only two curved fittings: 45 and small radius 90 degree, whereas 1 1/2" has 22.5 degree and large radius 90 degree options. I plan to specify large radius for the 90 degree bends as part of the fabrication instructions. Tweak the #2 and #4 primaries layout to create more clearance between the primaries and the lower cowl.
IMG_9865.jpg
IMG_9866.jpg
IMG_9867.jpg
IMG_9868.jpg
IMG_9869.jpg
IMG_9870.jpg
IMG_9871.jpg
IMG_9876.jpg
Jan 27, 2024
Test Fit #2 and #4 Primaries
- (5 hours)
Category: Engine
Fabricate four adapters from 1 1/2" pvc pipe for fitting the primaries to collector. Test fit primaries between #2 and #4 cylinders and collector. Routing was suboptimal. I want more than 1" spacing between pipes and cowling. The efforts today were educational for how to route the pipes and notice the clearance issues.
IMG_9855.jpg
IMG_9856.jpg
IMG_9857.jpg
IMG_9858.jpg
IMG_9859.jpg
IMG_9860.jpg
IMG_9861.jpg
IMG_9862.jpg
Jan 26, 2024
Mount Exhaust System Mockup Artifacts
- (4 hours)
Category: Engine
Received a 4 into 1 exhaust mockup kit from
http://www.experientalexhaust.com/.
Mount four primary stub stacks to the exhaust ports. Place lower engine cowling into approximate mounting location to measure clearances from the engine to the cowling. Create temporary mount for the 4 into 1 collector supported from the engine mount.
IMG_9841.jpg
IMG_9842.jpg
IMG_9843.jpg
IMG_9844.jpg
IMG_9845.jpg
IMG_9846.jpg
IMG_9847.jpg
IMG_9848.jpg
IMG_9849.jpg
IMG_9850.jpg
Jan 25, 2024
Mount Left Cable Raceway
- (1 hour)
Category: Wiring
Similar to the right side cable raceway, mount a raceway on the left fuselage upright post to route wiring from the left side of the instrument panel to aft locations. Place a section of raceway along the floor to route the wiring from the post to forward of the main spar. The final location for the floor mounted raceways will be determined when installing floorboard carpets.
IMG_9839.jpg
Jan 23, 2024
Mount Cable Raceway
- (1 hour)
Category: Wiring
Rivet cable raceway to upright post on right side of fuselage to channel wires from the instrument panel routed to aft locations. The raceway cover is removable and I've used tape to temporarily contain the wires while evaluating the overall installation. Lay in place a raceway to route wires along the floor from the support to forward of the main spar. Replace tape with raceway cover.
IMG_9837.jpg
IMG_9851.jpg
Jan 20, 2024
Connect OAT sensor to AHRS
- (1 hour)
Category: Avionics
Connect 3 conductor shielded cable feeding the outside air temperature to the AHRS connector. Organize the wiring at the primary avionics fuse block
Jan 20, 2024
Update Secondary Battery Wiring
- (4 hours)
Category: Wiring
Add #18 shielded wire to battery plus cable and attach shield to batter negative terminal. Run shielded wire to fuse block on subpanel and connect to two fuses. One fuse for the transponder keep alive and the other fuse for power to the right Lightspeed ignition. Reconnect battery shunt sense cables to fuse block. Attach Transponder keep alive lead to fuse block.
IMG_9820.jpg
IMG_9821.jpg
IMG_9822.jpg
Jan 19, 2024
Wire Avionics Bus to Airframe
- (6 hours)
Category: Avionics
Attach power and ground wires from all Avionics LRUs to primary and secondary fuse blocks. Mount terminal strip to subpanel for connecting copilot PTT, panel dimmer control line, and TOGA (Connected but not used)
IMG_9814.jpg
IMG_9816.jpg
Jan 14, 2024
Place Avionics Wiring Harness in Airframe
- (5 hours)
Category: Avionics
Place the avionics wiring harness in the airframe and verify key connectors to the engine monitor and ADS-B receiver fit. Connect airframe CAN bus to ADHRS. Remove wiring to Lightspeed ignition to simplify wire routing. Move nut plates to better position Adel clamps that attach the harness transiting forward of the subpanel to aft. Rerun wiring from subpanel to the right fuselage floorboard and aft through the carry through spar.
IMG_9809.jpg
IMG_9810.jpg
Jan 13, 2024
Complete Avionics Wiring Harness
- (8 hours)
Category: Avionics
Completed creating a new wiring harness for all Garmin LRUs. Performed continuity check for power, ground, and communication busses. The harness is ready to install.
IMG_9808.jpg
Jan 06, 2024
Create New Wiring Harness
- (6 hours)
Category: Avionics
Depin connectors to remove old wiring harness, Fabricate new wiring harness for GMC 507, GMA 245, GTR 200, and GTX 335. The new wiring harness corrects some flaws in the original wiring. All LRU wires use one common routing to move to the aft side of the subpanel. This allows the harness to be placed into the subpanel collocated with the existing wiring. The new harness allows for longer runs to the displays so that the displays have sufficient slack such that the connectors can be accessed from the front panel.
IMG_9790.jpg
Jan 05, 2024
Start Avionics Bus Rewire
- (2 hours)
Category: Avionics
Measure LRU locations to establish approximate cable length, and topographic view depicting the cable paths. Start with GMC 507 and GMA 245 CAN bus and power. Fabricate CAN cable connection to the GMC 507.
IMG_9781.jpg
IMG_9782.jpg
Jan 05, 2024
Fabricate mixture cable bushing
- (2 hours)
Category: Engine
Fabricate a mixture cable bushing similar to the throttle cable bushing with a longer threaded portion for the cable.
IMG_9777.jpg
IMG_9778.jpg
IMG_9779.jpg
Jan 04, 2024
Fabricate prototype bushing
- (2 hours)
Category: Engine
Fabricate from 3/4" round aluminum bar a bushing that screws on to the throttle control cable. The bushing has threads that mount the bushing to the throttle cable bracket. A similar bushing will be fabricated to mount the mixture cable.
IMG_9771.jpg
IMG_9774.jpg
IMG_9775.jpg
Dec 30, 2023
Test fit Throttle and Mixture cable attachments
- (4 hours)
Category: Engine
Received clevises for mixture and throttle cables. Clock the throttle body throttle and mixture lever arms based on the cable mounting location. Both cables need additional mounting fixtures because the cable threaded ends are aft of their respective mounting brackets. The mixture cable mount needs to move left about 1" to line with the mixture lever. Fabricate bracket attached to existing mixture bracket to move attachment point 1" left. Verify throttle and mixture cables can operate their respective levers through their full range of motion. Ordered material to fabricate fixtures to mount both cables to their respective brackets. The mixture arm for the Precision Airmotive throttle body is different from the arm called out in the filter air box instructions. The good news is the new arm does not require the filter air box to be modified to correct for interference.
IMG_9750.jpg
IMG_9751.jpg
IMG_9752.jpg
IMG_9753.jpg
IMG_9754.jpg
IMG_9755.jpg
IMG_9758.jpg
IMG_9759.jpg
IMG_9760.jpg
Dec 29, 2023
Oil Cooler Firewall Mounting Flange
- (2 hours)
Category: Engine
Drill and countersink center nutplate. Rivet left and right doublers, and three nutplates to firewall. Mount oil cooler flange to firewall.
IMG_9736.jpg
IMG_9737.jpg
Dec 24, 2023
Firewall Oil Cooler Mount
- (4 hours)
Category: Engine
Fabricate two doubler plates to reinforce the outside fasteners holding the aft oil cooler mounting bracket to the firewall. Drill, deburr, and dimple the firewall at the oil cooler mounting site. Will await assistance before riveting. Also need to order one K2000-3 MS21051L3 nutplate.
IMG_9718.jpg
IMG_9719.jpg
IMG_9720.jpg
IMG_9721.jpg
IMG_9722.jpg
IMG_9723.jpg
Dec 22, 2023
Tentative oil cooler mount
- (4 hours)
Category: Engine
Fabricate two attachment bars with nut plates. One bar will provide stabilized mounting one side of the oil cooler to the engine mount using Adel clamps. The other bar will clamp to an angle mounted to the firewall.
IMG_9715.jpg
IMG_9716.jpg
Dec 21, 2023
Adjust Mixture Cable
- (1.5 hours)
Category: Engine
Bend mixture cable mounting bracket to line cable with mixture control arm. Reclock mixture control arm to line up with mixture cable.
IMG_9714.jpg
Dec 21, 2023
Wire Starter Motor and Engine Ground
- (3 hours)
Category: Wiring
Attach power cable from starting solenoid to starter motor. Add Adel clamps for support. Attach grounding strap from engine to negative battery terminal.
IMG_9708.jpg
IMG_9709.jpg
IMG_9710.jpg
IMG_9712.jpg
IMG_9713.jpg
Dec 19, 2023
Mount Fuil Injection Throttle Body
- (3 hours)
Category: Engine
Mount fuel injection throttle body and cable mounting bracket. Temporarily place throttle and mixture cables to check for fit and alignment. The mixture cable bracket needs a slight bend to line the cable with the control arm.
IMG_9695.jpg
IMG_9696.jpg
Dec 19, 2023
Remove all wiring to Garmin Avionics
- (2 hours)
Category: Wiring
My original wiring did not have as much slack at the connectors that I felt was needed. Also, the CAN bus has an intermittent connection. Remove all Garmin bus wiring at instrument panel. I will rewire the avionics in the coming months.
IMG_9694.jpg
Dec 19, 2023
Replace starter motor
- (1 hour)
Category: Engine
Replace Sky Tek starter motor with B&C starter motor.
IMG_9697.jpg
Dec 10, 2023
Mount engine to airframe
- (3.5 hours)
Category: Engine
With assistance from Barry, remove engine from shipping crate and mount it to the airframe.
IMG_9677.jpg
IMG_9680.jpg
Dec 08, 2023
Right Gear Leg Fairing
- (4.5 hours)
Category: Landing Gear
Fabricate right gear leg fairing fitting hinge, drilling, countersinking, and riveting hinge halves to gear leg fairing. Test tit engine rubber shock absorbing mounts to engine mount.
IMG_9674.jpg
IMG_9675.jpg
IMG_9676.jpg
Dec 06, 2023
Complete Left Landing Gear Fairing
- (3 hours)
Category: Landing Gear
Rivet one hinge half to the left landing gear fairing. Drill, countersink, and deburr the opposite hinge to the gear leg fairing. Rivet the hinge to the gear leg fairing. Fabricate a replacement left brake line.in order to fit better with fairing.
IMG_9671.jpg
IMG_9673.jpg
Dec 03, 2023
Start Gear Leg Fairing Fabrication
- (4 hours)
Category: Landing Gear
Trim gear leg fairing. Mount fairing to left gear leg and drill one hinge to faring. Machine countersink hinge attach rivets. Deburr hinge. Ready to set rivets.
IMG_9665.jpg
Nov 26, 2023
Fabricate Left Brake Line
- (2 hours)
Category: Landing Gear
Fabricate and install left brake line from firewall to left caliper. Need 3/8" plastic tubing fto complete attaching brake line to gear leg.
IMG_9650.jpg
IMG_9651.jpg
Nov 25, 2023
Fabricate Right Brake Line
- (4 hours)
Category: Landing Gear
Fabricate right brake line from firewall to right brake caliper. Drill holes for three nut plate attach points for Adel clamps.
IMG_9644.jpg
IMG_9645.jpg
IMG_9646.jpg
Nov 24, 2023
Attach Right Brake
- (1.5 hours)
Category: Landing Gear
Mount right brake and wheel pants mounting bracket to right landing gear leg.
IMG_9642.jpg
Nov 23, 2023
Mount Left Brake
- (2 hours)
Category: Landing Gear
Attach left brake and wheel fairing mount to gear leg.
IMG_9641.jpg
Nov 19, 2023
Attach engine mount and landing gear
- (3 hours)
Category: Landing Gear
Attach the engine mount to the fuselage. Attach the landing gear legs to the engine mount. Temporarily place tires on the axles.
IMG_9638.jpg
Nov 18, 2023
LRU Configuration
- (2 hours)
Category: Avionics
Temporarily attach engine sensor to GEA24 engine monitor and configure GEA24 for sensors.
IMG_9627.jpg
Nov 09, 2023
Power up Avionics
- (2 hours)
Category: Avionics
Apply power to avionics and begin test and LRU configuration task. Fix two CAN bus wiring errors. Verify transponder GPS antenna and ADS-B GPS antenna are receiving signals.
IMG_9608.jpg
Nov 06, 2023
Verify bus wiring
- (3 hours)
Category: Wiring
Verify remaining primary and secondary avionics bus power wiring. Run CAN bus to terminal block at right wing attach location to service the roll servo. Trim wire from ELT to ELT annunciator and attach 6P4C connector to wire. Attach wire to annunciator.
IMG_9602.jpeg
IMG_9603.jpeg
IMG_9604.jpeg
Nov 05, 2023
Verify fuse block wiring
- (1 hour)
Category: Wiring
Verify avionics primary and secondary fuse block wiring.
IMG_9600.jpeg
Nov 04, 2023
Install ADS-B and Transponder Antennas
- (5 hours)
Category: Avionics
Mount ADS-B and transponder antennas. Fabricate cables to connect transponder antenna to GTX 335 and ADS-B antenna to GDL 50R. Add connector to Com antenna wire and attach to GTR 200 Com radio.
IMG_9592.jpeg
IMG_9593.jpeg
IMG_9594.jpeg
IMG_9595.jpeg
IMG_9596.jpeg
IMG_9597.jpeg
Nov 03, 2023
Begin Wiring Checkout
- (2 hours)
Category: Wiring
Verify wiring for primary master contactor, secondary master contactor, and avionics master switch. Verify primary and secondary power, and ground for both G3X displays.
IMG_9591.jpeg
Nov 01, 2023
Fabricate and Install Antenna Cables
- (4 hours)
Category: Avionics
Attach RF connectors to ELT and GPS antenna cables. Route ELT antenna cable to ELT. Route GPS antenna cable to panel mounted GTX 335 transponder.
IMG_9586.jpeg
IMG_9588.jpeg
IMG_9589.jpeg
Oct 29, 2023
Mount Com Antenna
- (1 hour)
Category: Fuselage
Mount the Com antenna. I may rivet the doubler plate to the fuselage to facilitate future maintenance.
IMG_9570.jpeg
IMG_9571.jpeg
Oct 28, 2023
Antenna and Cable Infrastructure
- (5 hours)
Category: Fuselage
Mount 5 lug terminal strip to the fuselage on the right near the right wing attach point. This strip will splice the CAN bus to the roll servo and the autopilot disconnect wire. Permanently mount the ADS-B receiver mounting brackets to the forward fuselage. Fabricate a doubler plate for mounting the COM antenna to the bottom fuselage aft of the baggage compartment.
IMG_9561.jpeg
IMG_9562.jpeg
IMG_9563.jpeg
IMG_9564.jpeg
IMG_9565.jpeg
Oct 27, 2023
tid bits
- (2 hours)
Category: Fuselage
Fabricate a bracket to hold a 5 lug terminal strip. Add zip tie mounts to fuselage to route GPS and ELT antenna cables.
IMG_9557.jpeg
IMG_9558.jpeg
Oct 23, 2023
Add conduit
- (2 hours)
Category: Fuselage
Add conduit to route GPS and Com coax cables from center fuselage on right to behind the baggage compartment bulkhead.
IMG_9548.jpeg
IMG_9549.jpeg
Oct 22, 2023
Rivet Doubler Plates to fuselage
- (2 hours)
Category: Fuselage
Dimple fuselage at GPS and ELT doubler plates. With assistance rivet doubler plates to fuselage.
IMG_9536.jpeg
IMG_9537.jpeg
Oct 21, 2023
GPS & ELT antenna doubler plates
- (5 hours)
Category: Fuselage
Fabricate GPS and ELT antenna doubler plates. Match drill fuselage for both plates.
IMG_9521.jpeg
IMG_9522.jpeg
IMG_9523.jpeg
IMG_9524.jpeg
IMG_9525.jpeg
IMG_9526.jpeg
Oct 20, 2023
Complete Fly LEDs wiring
- (2 hours)
Category: Wiring
Complete wiring to Fly LEDs controller board. Mount ELT annunciator to subpanel.
IMG_9519.jpeg
IMG_9520.jpeg
Oct 18, 2023
Wiring at Fly LEDs Board
- (2 hours)
Category: Wiring
Reattach wiring to Fly LEDs board. Attach left and right switches from Pilot control stick to terminal board connecting to the elevator trim relay. Connect elevator trim motor to trim relay. Connect delevator autopilot disconnect to left and right Pilot control stick. Connect Pilot PTT from panel to Pilot control stick PTT button.
Items to be completed:
CoPilot PTT,
roll servo autopilot disconnect,
grounds from trim relay deck and Pilot control stick to local airframe ground.
IMG_9509.jpeg
Oct 16, 2023
Wire rerouting at Fly LED board
- (2 hours)
Category: Wiring
Initial routing of wires to Fly LED control board and trim relay had room for improvement. Route wires to the Fly LED control board through forward floor ribs. Route wires to the trim relay through a separate grommet hole in the center tunnel rib at the aft end of the control board. Wires rerouted and ready for connection.
IMG_9505.jpeg
Oct 15, 2023
Wiring cleanup
- (3 hours)
Category: Wiring
Replace in-line fuse for primary Lightspeed Ignition with fuse block mounted to firewall. Reroute wire bundle to firewall passthrough and add Adel clamps to stabilize run. Add Adel clamp to sensor wires routed out from the firewall passthrough.
IMG_9500.jpeg
IMG_9501.jpeg
Oct 14, 2023
Mount Terminal Blocks
- (3 hours)
Category: Wiring
Mount terminal block to subpanel to terminate wires from the ELT, power, and GPS input from GDU. Mount terminal block to firewall to terminate wires from the EMS for fuel flow and oil temperature sensors.
IMG_9495.jpeg
IMG_9497.jpeg
Oct 13, 2023
Rivet subpanel and instrument panel
- (4 hours)
Category: Fuselage
Complete riveting the instrument panel and subpanel to the fuselage.
IMG_9490.jpeg
IMG_9491.jpeg
IMG_9492.jpeg
IMG_9493.jpeg
IMG_9494.jpeg
Oct 10, 2023
Elevator Trim Circuit Breaker
- (1 hour)
Category: Wiring
Install 1A pull able circuit breaker for elevator trim. Run power from circuit breaker to the floor where the trim relay is mounted.
IMG_9488.jpeg
Oct 09, 2023
Rivet Firewall Recess to Firewall
- (1.5 hours)
Category: Firewall
Rivet Firewall Recess to Firewall
IMG_9486.jpeg
Oct 07, 2023
Mount ANL fuse block
- (2 hours)
Category: Firewall
Mount the 60A ANL fuse block to the firewall. Fabricate and install #4 wire between the fuse block and master solenoid.
IMG_9482.jpeg
IMG_9483.jpeg
Oct 01, 2023
Move pilot stick switch wiring
- (1 hour)
Category: Controls
Move the wire bundle from the pilot stick switch to exit from the side of the stick above the pivot rather than exit at the bottom. Route the wire bundle through the floor rib to the bay holding the trim relay.
IMG_9449.jpeg
Oct 01, 2023
Rivet subpanels
- (2 hours)
Category: Fuselage
Continue riveting forward fuselage subpanels.
IMG_9445.jpeg
IMG_9446.jpeg
IMG_9447.jpeg
Sep 30, 2023
Mount manifold and terminal block
- (4 hours)
Category: Firewall
Move sensor manifold on firewall to align with center rib for added stiffness. Mount terminal block to firewall. Terminate sensor wiring from EMS at terminal block.
IMG_9443.jpeg
Sep 26, 2023
Complete installing AHRS doubler plate
- (2 hours)
Category: Fuselage
Install nut plates and rivet AHRS doubler mounting plate to subpanel
IMG_9439.jpeg
Sep 24, 2023
Fuselage Modifications
- (8 hours)
Category: Fuselage
Move left and right wing wiring terminal blocks to inside of rib to allow full access to the outer bay when installing wing attachment bolts. Make doubler plate to attach ADHARS to subpanel. This location facilitates the display screen removal. Move sensor manifold attachment to firewall to a vertical alignment in line with center forward fuselage rib. This location is structurally stronger. Add terminal block to splice sensor wires to the leads from the GEA 24 EMS.
IMG_9430.jpeg
IMG_9431.jpeg
IMG_9432.jpeg
IMG_9433.jpeg
IMG_9436.jpeg
IMG_9437.jpeg
Sep 22, 2023
More wiring
- (4 hours)
Category: Wiring
Wire B&C primary power voltage regulator sense wire to main fuse block and pitot heat power from panel circuit breaker to terminal block near fuselage left wing. Wire Fly LEDs controller board for left wing (position lights, wing strobes, and landing lights) to terminal block near fuselage left wing. Wire strobe, landing light power from panel, and wig wag signal from panel to controller board.
Sep 21, 2023
More Wiring
- (4 hours)
Category: Wiring
Mount secondary power shunt to subpanel and splice in series with power from secondary battery. Add shunt sensor wiring and fuse blocks. Connect primary and secondary shut sensors, Light Speed tach signals, and wiring for fuel flow, fuel pressure, oil pressure, oil temperature, and manifold pressure to GEA 24 engine monitor. Mount sensor manifold to firewall.
IMG_9419.jpeg
IMG_9420.jpeg
IMG_9422.jpeg
IMG_9424.jpeg
Sep 17, 2023
Subpanel wiring
- (4 hours)
Category: Wiring
Wire both Lightspeed "P-leads" to the keyed ignition switch. Mount the B&C voltage regulator to the subpanel and wire supply pins to the primary master field switch field and then to the primary fuse block.
IMG_9409.jpeg
Sep 16, 2023
Subpanel fabrication and current shunt
- (6 hours)
Category: Fuselage
Begin riveting the forward fuselage subpanel. Add nutplates for mounting the primary fuse block. Fabricate bracket to hold the primary power shunt and sensor wire fuse blocks.
IMG_9396.jpeg
IMG_9397.jpeg
IMG_9402.jpeg
IMG_9403.jpeg
IMG_9404.jpeg
IMG_9405.jpeg
Sep 10, 2023
Fabricate terminal strip mount
- (6 hours)
Category: Wiring
Fabricate mounting for two 10 position barrier terminal strips, mounted near the main spar on the left and right sides. Wire the position and strobe light wires from the Fly LEDSs controller to the right wing barrier strip. Wire the power leads to the left Lightspeed module to the front panel circuit breaker.
IMG_9379.jpeg
IMG_9380.jpeg
IMG_9381.jpeg
IMG_9384.jpeg
IMG_9385.jpeg
Sep 08, 2023
LIghtspeed ignition wiring
- (4 hours)
Category: Wiring
Mount pre-made cable attaching power and the mini crank sensor to both Lightspeed ignition modules. The sensor connectors fit through the firewall penetrations without the back shells. Shield the sensors on the engine side of firewall with bubble wrap for protection until ready to mount to engine. Attach elevator trim tab position wires and two fuel level sensor wires to the GEA 24 engine monitor.
IMG_9364.jpeg
IMG_9365.jpeg
IMG_9366.jpeg
IMG_9367.jpeg
IMG_9368.jpeg
Sep 03, 2023
GPS keep alive fuse
- (1 hour)
Category: Wiring
Mount a single fuse block from the secondary battery for GTX 335 GPS keep alive pin.
IMG_9343.jpeg
Sep 02, 2023
More Panel Wiring
- (3 hours)
Category: Instrument Panel
Wire the copilot mic and headphone jacks. Wire the auxiliary power socket. Wire the USB power socket.
IMG_9341.jpeg
IMG_9342.jpeg
Sep 01, 2023
Primary Power to panel
- (2 hours)
Category: Instrument Panel
Replace the dual split bus bar connecting circuit breaker switches on front panel with a one piece bus bar. Wire bus bar to primary power distribution header. Wire pilot side microphone and headphone panel jacks.
IMG_9340.jpeg
Aug 31, 2023
Lighting and Panel power
- (2 hours)
Category: Instrument Panel
Fabricate two copper bus bars to connect panel circuit breaker switches. Connect strobe, landing, and position light wiring to corresponding panel circuit breaker switches. Connect wig-wag wire to panel mounted switch.
IMG_9338.jpeg
IMG_9339.jpeg
Aug 29, 2023
Flap & ELT Power
- (3 hours)
Category: Wiring
Connect ELT to main bus fuse block. Run wire from flap motor location forward and up to the flap switch on the instrument panel. Wire flap switch to allow reversing the flap motor direction. Connect flap power to main fuse block. Add nutplates to subpanel to attach two Adel clamps for holding wire coming up from the floor along the fuel vent lines on the left and right side.
IMG_9332.jpeg
IMG_9333.jpeg
Aug 27, 2023
Instrument Panel attachment bracket
- (1.5 hours)
Category: Instrument Panel
Fabricate a mounting tab that attaches to the instrument panel right side to the right fuselage attachment bracket. The tab fastens the instrument panel lower lip to the right fuselage bracket. I cut the panel to facilitate installation. The mounting tab uses 2 #8 screws and nutplates to fasten the panel lip to the fuselage.
IMG_9323.jpeg
IMG_9324.jpeg
Aug 27, 2023
Wire Copilot Display and Remote GPS/ADS-B
- (5 hours)
Category: Avionics
Wire the copilot display and GDL 50R remote GPS/ADS-B receiver.
IMG_9321.jpeg
IMG_9322.jpeg
Aug 25, 2023
Wire EMS Power/Communication Cable
- (3 hours)
Category: Avionics
Wire the GEA 24 Connector providing power, CAN, and engine data to copilot display.
IMG_9300.jpeg
Aug 14, 2023
Wire avionics power
- (4 hours)
Category: Avionics
Mount primary bus fuse block to fuselage with power routed from the load side of the primary battery contactor. Wire avionics boxes power 1, power 2, and ground to avionics primary and secondary fuse blocks.
IMG_9263.jpeg
IMG_9264.jpeg
IMG_9265.jpeg
Aug 13, 2023
Primary Bus Wiring
- (8 hours)
Category: Wiring
Wire system power from load side of master contactor to 4 post terminal block. Connect avionics master relay to terminal block. Fabricate mounting bracket for primary power fuse block. Install nut plates in fuselage stringer for attachment. Update schematic and fuse block and switch list to correlate with latest design.
IMG_9257.jpeg
IMG_9259.jpeg
Aug 13, 2023
Power wiring
- (8 hours)
Category: Wiring
For both Lightspeed ignition power wiring, connect the braid directly to the corresponding primary and secondary batteries. Add a wire to the secondary battery Lightspeed power to supply power for GTX 335 keep alive. Fabricate a bracket and install a relay to control power to the avionics primary bus controlled by a panel mounted avionics master switch. Fabricate a bracket to hold a 4 terminal bus connection that will distribute power from the primary battery to the avionics primary bus and the primary power bus (anything not connected to primary or secondary avionics bus).
IMG_9253.jpeg
IMG_9254.jpeg
Aug 07, 2023
Tech Advisor visit
- (1 hour)
Category: Inspection
Mike Hilger, technical advisor, inspected my construction for the first time. Mike approved of my work to date and answered all of my questions. Thank you, Mike, for sharing your experience and perspective. I can proceed with confidence knowing that my construction efforts are not deficient.
Aug 07, 2023
wing tip lens
- (2 hours)
Category: Wings
Trim wing tip lens, add two nut plates to wing tip, attach lens to tip.
IMG_9216.jpeg
IMG_9217.jpeg
Aug 06, 2023
Right wing tip lights
- (6 hours)
Category: Wings
Mount right wing tip to wing. Cut out wing tip to fit "The Works" FlyLED circuit boards. Install nut plates to fasten both circuit boards to wing tip.
IMG_9214.jpeg
IMG_9215.jpeg
Aug 05, 2023
A few wires
- (1 hour)
Category: Firewall
Attach master solenoid coil wire and primary bus power to cockpit. File the split rocker switch opening to 1.25" tall.
IMG_9208.jpeg
IMG_9209.jpeg
Aug 04, 2023
Primary Battery grounding strp
- (.5 hour)
Category: Firewall
Attach ring terminal to grounding strap and attach strap to firewall and primary battery
IMG_9207.jpeg
Aug 04, 2023
Wing Inspection Panel Nut Plates
- (1 hour)
Category: Wings
Dimple two right wing inspection panels in lower wing skin. Dimple for #8 screws, dimple and rivet nutplates.
IMG_9206.jpeg
Jul 31, 2023
Attach nut plates to right wing tip
- (8 hours)
Category: Empennage
Drill, machine countersink, and rivet W-931 rib to wing tip. Attach 4-40 plate nuts to wing tip.
IMG_9201.jpeg
IMG_9202.jpeg
Jul 29, 2023
Right wing tip
- (4 hours)
Category: Empennage
Attach right aileron to wing and affix in the neutral position with the W-903 adjustment fixture. Fit right wing tip to wing and align with the aileron. Match drill the wing tip to the wing skin. Insert the W-916 tip rib into the tip and drill for rivets. Machine countersink tip rivet holes and rivet the rib tip. Insert the W-931 rib tip in place and adjust to fit the tip. Mark the rib location and bond the rib in place with thickened epoxy.
IMG_9182.jpeg
IMG_9183.jpeg
Jul 28, 2023
Empennage intersection fairing
- (4 hours)
Category: Empennage
Trim the empennage intersection fairing. Place the fairing on the fuselage and match drill through the fairing to the existing holes in the vertical and horizontal stabilizer and the fuselage.
IMG_9176.jpeg
IMG_9177.jpeg
IMG_9178.jpeg
Jul 27, 2023
Add aircraft ground
- (2 hours)
Category: Firewall
Create battery ground to aircraft frame on firewall for primary and secondary batteries. Need to install a ring terminal on the ground braid to the primary battery.
IMG_9173.jpeg
IMG_9174.jpeg
IMG_9175.jpeg
Jul 22, 2023
primary bus avionics fuse block
- (2 hours)
Category: Instrument Panel
Fabricate mounting plate identical to secondary fuse block mounting plate to hold primary avionics bus fuse block. Mount fuse block to left side of subpanel.
IMG_9164.jpeg
IMG_9165.jpeg
Jul 21, 2023
secondary avionics bus fuse block
- (3 hours)
Category: Instrument Panel
Fabricate a mounting plate for the secondary avionics bus fuse block. Mount fuse block and secondary bus master relay. Mount plate to right side of subpanel.
IMG_9156.jpeg
IMG_9157.jpeg
IMG_9159.jpeg
IMG_9160.jpeg
IMG_9161.jpeg
Jul 19, 2023
Fitting canopy frame
- (8 hours)
Category: Fuselage
Starting on July 15, worked several hours per day reading the instructions for fitting the canopy side frames to the longerons and fitting the frame. Completed fitting today. Checked rear bow fit with aft turtledeck skin with the bow below the skin by 1/8 to 5/8". Checked front bow with roll bar. Front bow 1/4 to 3/4" higher than roll bar. Will consider trimming the front bows where the rollers attach after fitting the canopy bubble.
Jul 14, 2023
Fit sliding canopy frame to fuselage
- (8 hours)
Category: Fuselage
Cut and drill canopy slide rails. Fabricate center canopy guide. Temporarily mount slide rails and canopy guide to fuselage and begin fitting the canopy sliding frame.
IMG_9130.jpeg
IMG_9131.jpeg
IMG_9132.jpeg
IMG_9134.jpeg
IMG_9135.jpeg
IMG_9136.jpeg
Jul 09, 2023
Attach Roll Bar
- (8 hours)
Category: Fuselage
Fabricate attachment shims, lay out roll bar attach points. Drill fuselage roll bar attach points and bolt roll bar to fuselage. Trim roll bar brace, match drill, and bolt brace to roll bar and fuselage.
IMG_9112.jpeg
IMG_9113.jpeg
IMG_9114.jpeg
IMG_9120.jpeg
Jul 09, 2023
Add penetrations for cabling and vacuum line
- (4 hours)
Category: Firewall
Add firewall penetrations for vacuum line, sensor wiring, LIghspeed Ignition trigger wires, and cockpit power.
IMG_9116.jpeg
IMG_9118.jpeg
Jul 07, 2023
Add subpanel supports for avionics and control cables
- (4 hours)
Category: Fuselage
Created subpanel supports for the avionics stack and control cables. The control cables will be attached with Adel clamps.
IMG_9096.jpeg
IMG_9097.jpeg
Jul 02, 2023
Attach stick grips
- (2 hours)
Category: Fuselage
Attach pilot and copilot stick grips to control sticks. Trim both sticks to eliminate interference with instrument panel controls.
IMG_9089.jpeg
IMG_9090.jpeg
Jul 01, 2023
Test fit panel
- (4 hours)
Category: Fuselage
Cleco upper deck spars and subpanels,and mount panel in fuselage to test fit wiring with cutout hole in subpanel. Organize wiring routed from aft into two bundles that will route to the panel along the floor to the forward uprights, one on the left and the other on the right
IMG_9067.jpeg
IMG_9068.jpeg
IMG_9069.jpeg
Jun 30, 2023
Avionics Wiring
- (4 hours)
Category: Avionics
Wire the GSU 25C and Pilot GDU 460 connectors and attach backshells.
IMG_9065.jpeg
IMG_9066.jpeg
Jun 29, 2023
Left Wing Tip plate nuts
- (2 hours)
Category: Wings
Mount 4-40 plate nuts to left wing tip. Machine countersink left wing tip skin. The flat head screws are slightly above the skin. May countersink deeper at a future time.
IMG_9055.jpeg
Jun 25, 2023
Transponder Backshell
- (3 hours)
Category: Avionics
Assemble and install GTX 335 Transponder connector backshell.
IMG_9049.jpeg
Jun 24, 2023
Complete backshells
- (3 hours)
Category: Avionics
Complete connector back shells for GMA 245 Audio Panel and GTR 200 Comm Radio.
IMG_9048.jpeg
Jun 20, 2023
Wing Inspection Covers
- (3 hours)
Category: Wings
Drill, dimple, and prime 4 wing inspection covers. Attach nut plates to two left wing inspection cover locations.
IMG_9035.jpeg
IMG_9036.jpeg
Jun 18, 2023
Complete left wing lens cap
Category: Lighting
Trimmed left wing lens cover to fit recessed lip on wing tip. Install two nut plates to mount lens to wing.
IMG_9027.jpeg
IMG_9028.jpeg
Jun 09, 2023
Start mounting left wing tip lights
- (3 hours)
Category: Lighting
Prepare left wing tip for FlyLEDs "The Works" kit including landing lights, position light, and strobe lights. Cut left wing tip to fit printed circuit boards. Drill PCB mounting holes to position nut plates. Trim PCB to fit wing tip contour. Cut wing tip lens half in two.
IMG_8938.jpeg
IMG_8939.jpeg
IMG_8940.jpeg
Jun 07, 2023
Audio Panel wiring
- (2 hours)
Category: Avionics
Wire #2 connector except for copilot PTT wire (need to buy).
IMG_8920.jpeg
Jun 07, 2023
Rivet wing tip stiffener rib
- (1 hour)
Category: Wings
Drill, countersink wing tip, and rivet stiffening rib to wing tip.
IMG_8918.jpeg
IMG_8919.jpeg
Jun 05, 2023
Install wing tip ribs
- (3 hours)
Category: Wings
Match drill, countersink, and rivet outboard rib to left wing tip. Using a bright light inside the tip outline the position of the stiffening rib. Match drill and epoxy stiffening rib to left wing tip.
IMG_8911.jpeg
IMG_8912.jpeg
Jun 04, 2023
Fit left wing tip
- (4 hours)
Category: Wings
Mount left wing tip to wing. Match drill tip to wing.
IMG_8904.jpeg
IMG_8905.jpeg
IMG_8906.jpeg
Jun 04, 2023
Attach left aileron to wing
- (4 hours)
Category: Wings
Attach left aileron to wing hinge brackets and pushrod to aileron bellcrank. Affix aileron neutral position fixturing bracket.
IMG_8898.jpeg
IMG_8899.jpeg
IMG_8900.jpeg
IMG_8902.jpeg
Jun 03, 2023
Attach aileron hinge brackets
- (3 hours)
Category: Wings
Attach inboard and outboard aileron hinge brackets to left and right ailerons
IMG_8882.jpeg
IMG_8883.jpeg
IMG_8884.jpeg
Jun 02, 2023
Begin panel wiring
- (2 hours)
Category: Avionics
Review videos on Stein-Air website for how to wire connectors. Begin wiring at autopilot control.
IMG_8879.jpeg
Jun 02, 2023
Ailerons and Flaps delivered
- (1 hour)
Category: Wings
Received quick build flaps and ailerons. Unpack and inspect no damage.
IMG_8876.jpeg
IMG_8877.jpeg
IMG_8878.jpeg
IMG_8880.jpeg
Jun 01, 2023
Panel wiring preparation
- (3 hours)
Category: Avionics
Review avionics schematic provided by Stein-Air to identify how the individual LRUs interconnect (autopilot control, audio panel, comm radio, transponder, two displays, engine monitor, ADS-B, and AHRS module. Review Garmin G3X installation manual to identify how to connect wiring and shields to LRU connectors. Inventory LRU back shell connector kits.
May 28, 2023
Mount Alternate Air Door cable pass through
- (2 hours)
Category: Fuselage
Drill firewall for alternate air door firewall pass through fitting. Tight space between mounted throttle fitting and vertical angle brace. Trim edge of throttle firewall pass through fitting and starter solenoid mounting bracket reinforcement plate to accommodate pass through fixture.
IMG_8837.jpeg
IMG_8839.jpeg
May 28, 2023
Fabricate secondary battery hold down strap
- (3.5 hours)
Category: Fuselage
Fabricate hold down strap for secondary battery. Scuff and prime strap. Removable by pulling hinge pins.
IMG_8833.jpeg
IMG_8834.jpeg
IMG_8835.jpeg
IMG_8836.jpeg
IMG_8840.jpeg
IMG_8841.jpeg
May 28, 2023
Fabricate new avionics tray rails
- (4 hours)
Category: Avionics
Mount avionics tray mounting rails.
IMG_8822.jpeg
IMG_8825.jpeg
IMG_8826.jpeg
IMG_8829.jpeg
IMG_8830.jpeg
IMG_8831.jpeg
IMG_8832.jpeg
May 27, 2023
Test fit secondary battery box
- (8 hours)
Category: Avionics
Scuff and prime battery box. Scuff and prime all forward upper fuselage subpanels, ribs, and attaching artifacts. Mount battery box to fuselage. Drill avionics support angles for trays. The drilled holes were imprecisely placed and this work was scrapped and new supporting angles fabricated and riveted to instrument panel.
IMG_8817.jpeg
IMG_8819.jpeg
May 27, 2023
Cut avionics subpanel mounting hole
- (3 hours)
Category: Avionics
With avionics trays temporarily mounted to panel mark the location of a hole in the subpanel for access to rear connectors. Cut right side of instrument panel to at the headphone jack and fresh air vent to allow panel to be installed without interference with center section vertical bulkhead. Prior the panel needed to be forced to slip past the bulkhead.
IMG_8815.jpeg
IMG_8816.jpeg
IMG_8814.jpeg
May 26, 2023
Battery box for secondary bus
- (8 hours)
Category: Avionics
Fabricate a battery box to hold the 12 AH battery supplying power to the secondary avionics bus and Lightspeed ignition.
IMG_8813.jpeg
May 23, 2023
Avionics and display mounts
- (3 hours)
Category: Instrument Panel
Drill and rivet display mounts to instrument panel. Fabricate angle mounts for avionics trays and rivet to instrument panel. Place avionics in panel for test tit.
IMG_8798.jpeg
IMG_8799.jpeg
IMG_8800.jpeg
IMG_8802.jpeg
IMG_8804.jpeg
IMG_8805.jpeg
May 21, 2023
Complete match drilling forward top skin
- (4 hours)
Category: Fuselage
Clamp forward upper fuselage skin to workbench and roll form it around a pipe to add bend. Cleco and match drill the forward upper fuselage skins to fuselage and firewall..
IMG_8794.jpeg
IMG_8795.jpeg
IMG_8797.jpeg
May 19, 2023
Fabricate panel mounting angles
- (1.5 hours)
Category: Instrument Panel
Fabricate panel to fuselage mounting angles
IMG_8784.jpeg
IMG_8785.jpeg
May 19, 2023
Test fit forward upper fuselage skin
- (1 hour)
Category: Fuselage
Cleco forward upper fuselage skin to fuselage in preparation for match drilling and dimpling to airframe and identify precise instrument panel location prior to drilling holes for panel to fuselage mounting angles.
IMG_8786.jpeg
IMG_8787.jpeg
IMG_8788.jpeg
May 19, 2023
Rivet left wing lower outboard skin
- (3 hours)
Category: Wings
Complete riveting left wing lower outboard skin.
IMG_8789.jpeg
May 18, 2023
Replace right wing vent line
- (2 hours)
Category: Fuselage
Right wing fuel tank vent line interfered with subpanel. Fabricate new vent line fitted to avoid interference.
IMG_8783.jpeg
May 18, 2023
Begin riveting left wing lower outboard skin
- (2 hours)
Category: Wings
Begin riveting left wing lower outboard skin. Rivet skin to aft wing spar
May 14, 2023
Replace left wing tank vent line
- (2 hours)
Category: Fuselage
Original left wing vent line interfered with subpanel. Fabricate and install new vent line.
IMG_8742.jpeg
IMG_8743.jpeg
May 14, 2023
Prepare left wing skin
- (4 hours)
Category: Wings
Prepare left wing lower outer skin: Match drill, scuff with Scotch Brite, dimple, and prime inside surface. Rough cut pitot mast hole.
IMG_8731.jpeg
IMG_8732.jpeg
IMG_8733.jpeg
IMG_8734.jpeg
IMG_8735.jpeg
IMG_8736.jpeg
IMG_8737.jpeg
IMG_8738.jpeg
IMG_8739.jpeg
IMG_8740.jpeg
IMG_8741.jpeg
May 14, 2023
Discover leading edge wing ding
- (1 hour)
Category: Wings
Upon placing left wing on bench discovered dent in leading edge resulting from a dropped bucking bar when mounting the pitot mast earlier. Confer with technical advisor, Tom Berge, for repair strategy. Also send email to Vans requesting advice.
IMG_8729.jpeg
May 13, 2023
Rivet wing skin
- (6 hours)
Category: Wings
Started with 2 hours on 5/12 and finished on 5/13 rivet lower right outboard wing skin. Place left wing on workbench.
IMG_8724.jpeg
IMG_8725.jpeg
May 12, 2023
Assemble main tires and tubes on rims.
- (2 hours)
Category: Wings
Assemble main tires and tubes on rims with brake disks. Inflate tires to 35 psi. Place tape over exposed wheel bearings.
IMG_8708.jpeg
IMG_8748.jpeg
IMG_8749.jpeg
May 12, 2023
Fuselage cutout for gear legs and drill mounting holes
- (4 hours)
Category: Wings
Trim lower fuselage skin to create space for the gear legs per direction from Vans. Drill engine mount holes to final 3/8" diameter and attach engine mount to fuselage using hardware bolts.
IMG_8709.jpeg
IMG_8710.jpeg
IMG_8715.jpeg
IMG_8716.jpeg
IMG_8718.jpeg
IMG_8719.jpeg
IMG_8720.jpeg
IMG_8721.jpeg
May 11, 2023
Install left wing aileron and flap gap seals
- (3 hours)
Category: Wings
Match drill, deburr, and dimple left wing aileron and flap gap seals. Rivet gap seals except for flap seal to aft spar which will need assistance.
IMG_8706.jpeg
IMG_8707.jpeg
May 10, 2023
Mount Left Wing Aileron Brackets
- (2 hours)
Category: Wings
Mount left wing aileron brackets. Install inboard aileron bracket reinforcement kit per service bulletin. Burnish and prime left wing flap and aileron gap seals.
IMG_8700.jpeg
IMG_8701.jpeg
IMG_8702.jpeg
IMG_8703.jpeg
IMG_8704.jpeg
May 07, 2023
Mount ADS-B receiver and more
- (8 hours)
Category: Avionics
Create mount for ADS-B receiver. Create mount for Engine Management System. Rivet Lightspeed ignition mounting to instrument panel ribs,
IMG_8684.jpeg
IMG_8685.jpeg
IMG_8686.jpeg
IMG_8687.jpeg
IMG_8688.jpeg
IMG_8689.jpeg
IMG_8690.jpeg
IMG_8691.jpeg
IMG_8693.jpeg
May 06, 2023
Mount Lightspeed Ignition Modules
- (6 hours)
Category: Engine
Devise a way to mount the Lightspeed brainboxes to the instrument panel ribs using piano hinges and aluminum bar. Modules can be removed by pulling the hinge pins. Hinge pins held in place with a zip tie. Defer priming and final riveting until the EMS and ADS-B modules also mounted. Due to slight variations in tolerances the modules are not interchangeable right for left.
IMG_8677.jpeg
IMG_8678.jpeg
IMG_8679.jpeg
May 03, 2023
Right wing
- (2.5 hours)
Category: Wings
Finished dimpling the right lower outer wing skin, scuffed inside surface with Scotch Brite, and applied primer. Completed riveting right wing flap gap seal to rear spar.
May 02, 2023
Right wing gap fairings and aileron bracket service bulletin
- (10 hours)
Category: Wings
Drill out right wing inboard aileron hinge bracket and install hinge reinforcement brackets according to service bulletin. Match drill, dimple, and prime the right wing aileron and flap gap seals. Rivet gap seals to wing except for flap seal rivets to rear wing spar.
IMG_8665.jpeg
IMG_8666.jpeg
IMG_8667.jpeg
May 01, 2023
Prepare flap and aileron gap seals
- (4 hours)
Category: Fuselage
Match drill, dimple, and prime right wing aileron and flap gap seals.
Apr 30, 2023
Fabricate aileron hinge brackets
- (6 hours)
Category: Wings
Fabricate left and right aileron brackets. Rivet right wing aileron brackets to rear wing spar. Match drill right wing bottom outboard wing skin.
IMG_8653.jpeg
IMG_8654.jpeg
IMG_8655.jpeg
IMG_8656.jpeg
IMG_8659.jpeg
Apr 29, 2023
Install copper bus bar
- (1 hour)
Category: Firewall
Fabricate and install copper bus bar connecting master contactor and starter solenoid.
IMG_8650.jpeg
Apr 28, 2023
Complete aft top skin riveting
- (2 hours)
Category: Fuselage
Complete riveting the aft top skin at and forward from the baggage compartment bulkhead.
IMG_8648.jpeg
IMG_8649.jpeg
Apr 28, 2023
Mount heat control cable and electrical components
- (10 hours)
Category: Firewall
Drill firewall heater control cable penetration and mount the fitting and cable. Create doubler plate to mount the master contactor and starter solenoid to firewall. Add nut plates to firewall and firewall stiffener angles, and mount components.
IMG_8647.jpeg
IMG_8646.jpeg
Apr 27, 2023
Rivet aft top fuselage skin
- (4 hours)
Category: Fuselage
Cleco aft top skin to fuselage and rivet to fuselage except for rivets at and forward from the baggage compartment bulkhead.
IMG_8642.jpeg
IMG_8643.jpeg
Apr 25, 2023
Horizontal Stabilizer trim pieces
- (3 hours)
Category: Fuselage
Fit horizontal stabilizer trim pieces to fuselage. Match drill and dimple trim to fuselage holes. Trim about 1/16" to create a gap between the trim piece and HS.
IMG_8637.jpeg
IMG_8638.jpeg
Apr 23, 2023
Rudder pedal brake lines
- (2 hours)
Category: Fuselage
Install fittings to brake cylinders. Cut for fit the left and right brake lines. Check for fit in fuselage.
IMG_8627.jpeg
IMG_8628.jpeg
Apr 22, 2023
Fabricate battery box and drill firewall penetrations
- (8 hours)
Category: Fuselage
Started on 4/21 and finishing today. Fabricate battery box and install on firewall. Create steel template for drilling fire wall penetrations for DoubleTee firewall fittings. Locate and drill throttle, mixture, and propeller governor fittings and install on firewall.
IMG_8611.jpeg
IMG_8620.jpeg
IMG_8621.jpeg
IMG_8622.jpeg
IMG_8624.jpeg
IMG_8625.jpeg
IMG_8626.jpeg
Apr 16, 2023
Paint fuselage interiorq
- (2 hours)
Category: Fuselage
Mask and cover fuselage in preparation for painting. Wipe all surfaces to be painted with coarse Scotch Brite pad and wipe with tack cloth. Hired painter to paint the fuselage interior. Jeff did a fabulous job.
IMG_8595.jpeg
IMG_8599.jpeg
IMG_8601.jpeg
IMG_8604.jpeg
IMG_8605.jpeg
IMG_8606.jpeg
Apr 11, 2023
Pick up removable interior panels from paint shop
- (2 hours)
Category: Fuselage
Inventory and transport 30 removable panels, flooring, and seat backs to paint shop. Pick up painted parts.
IMG_8584.jpeg
IMG_8585.jpeg
Apr 08, 2023
Attach fuel senders to mounting plate
- (6 hours)
Category: Fuselage
Attach fuel senders with cork gaskets to fuel line mounting plates. Kit inventory provided two left tank sending units 385B. Install the right sending unit upside down. Bend float rods and install on senders. Attach right sender to left tank and left sender to right tank with floats facing outside. Verify float travel from minimum to maximum travel.
IMG_8570.jpeg
IMG_8571.jpeg
IMG_8572.jpeg
IMG_8573.jpeg
IMG_8574.jpeg
Apr 08, 2023
Mount light control board
- (6 hours)
Category: Fuselage
Fabricate mounting bracket for FlyLEDS "works" control circuit board. Attach bracket to fuselage.
IMG_8567.jpeg
IMG_8568.jpeg
Apr 03, 2023
Fuel line mounting plates
- (4 hours)
Category: Wings
Fabricate fuel sender and tank mounting plate gasket. Attach drop tubes with anti-rotation brackets. Seal drop tube brackets to mounting plates with Proseal.
IMG_8559.jpeg
IMG_8564.jpeg
Mar 31, 2023
Fabricate Pitot Tube mast mounting bracket
- (4.5 hours)
Category: Wings
Fabricate pitot tube mounting bracket. Ready to install.
IMG_8542.jpeg
IMG_8543.jpeg
IMG_8544.jpeg
IMG_8545.jpeg
IMG_8546.jpeg
IMG_8547.jpeg
IMG_8548.jpeg
IMG_8549.jpeg
Mar 30, 2023
Fuel selector valve and lines
- (4 hours)
Category: Fuselage
Mount fuel selector valve to valve mounting plate. Fit left and right fuel tank lines from the valve to outboard the fuselage. Temporary installation without flare fittings which will be added at final installation after installing the fuel filter and boost pump.
IMG_8540.jpeg
IMG_8541.jpeg
Mar 25, 2023
Collect panels for painter
- (2 hours)
Category: Fuselage
Collect all removable panels and cabin artifacts needing painting, label and catalog them prior to sending to the painter. Thirty items total.
IMG_8517.jpeg
Mar 25, 2023
Fabricate stick boot rings
- (2 hours)
Category: Fuselage
Fabricate two stick boot rings.
IMG_8516.jpeg
Mar 25, 2023
Fabricate and install left fuel tank vent line
- (3 hours)
Category: Fuselage
Fabricate and install left fuel tank vent line
IMG_8515.jpeg
Mar 24, 2023
Right Fuel Tank Vent Line
- (4 hours)
Category: Fuselage
Fabricate and install the right fuel tank vent line.
IMG_8490.jpeg
Mar 19, 2023
Wiring for ELT and Pitch Servo
- (4 hours)
Category: Fuselage
Route wiring from the empennage forward towards the pitch servo. Connect pitch servo wiring and route the wiring forward through the center tunnel. Wire the ELT except for the antenna, and run wiring forward through the center tunnel.
IMG_8486.jpeg
Mar 18, 2023
ELT and Mag Sensor
- (10 hours)
Category: Fuselage
Complete wiring the magnetometer connector. Fabricate a mounting plate for the ELT. Mount ELT to fuselage.
IMG_8461.jpeg
IMG_8462.jpeg
IMG_8463.jpeg
IMG_8464.jpeg
Mar 17, 2023
Wiring to Tail Light and Conduit to empennage
- (8 hours)
Category: Fuselage
Install conduit to carry wiring from the empennage forward to behind the baggage comparment. Install wiring tail light forward to the fuselage behind the baggage compartment. Rivet the rudder fairing.
IMG_8459.jpeg
IMG_8460.jpeg
Mar 15, 2023
Tail light wiring
- (4 hours)
Category: Fuselage
Add conduit to bottom of rudder tip. Drill hole through vertical stabilizer for tail light wire. Attach rudder to vertical stabilizer. Route tail light wire from empennage to tail light.
IMG_8450.jpeg
IMG_8451.jpeg
IMG_8452.jpeg
Mar 13, 2023
Routing static line
- (4 hours)
Category: Fuselage
Routed conduit along left side under the baggage floor and seat floor. Add cable ties to support static line leading to the conduit.
IMG_8446.jpeg
IMG_8447.jpeg
IMG_8448.jpeg
Mar 11, 2023
Flaps and Static Port
- (10 hours)
Category: Fuselage
Assembled flap mounting, added nut plates, and fit the side skirts. Mounted two static ports and routed line to the lower fuselage.
IMG_8434.jpeg
IMG_8436.jpeg
IMG_8437.jpeg
IMG_8438.jpeg
Mar 10, 2023
Flap attach bracket
- (6.7 hours)
Category: Fuselage
Make angles and plates for flap assembly. Fit bracket to fuselage and match drill. Attach flap motor to bracket and actuator. Rivet all flap bracket parts and nut plates. Attach nut plates to forward elevator push tube tunnel.
IMG_8427.jpeg
Mar 06, 2023
Install flap actuator
- (4 hours)
Category: Fuselage
Cut and drill 3 flap bearing blocks and install flap actuator in fuselage. Drill safety wire hole in the end of flap motor shaft.
IMG_8422.jpeg
IMG_8423.jpeg
Mar 05, 2023
Create carboard templates
- (3 hours)
Category: Fuselage
Create cardboard templates for fuselage floor and side walls.
cardboard templates.jpeg
Mar 04, 2023
Begin empennage wiring
- (5 hours)
Category: Fuselage
Install electric trim servo and wiring in elevator. Route wiring to rear bulkhead. Run rear tail light and strobe through empennage. Reinstall vertical stabilizer.
Mar 04, 2023
Install heat vent valve
- (5 hours)
Category: Fuselage
Drill two 2" holes in firewall for heat valve. Use 2" hole saw and a piece of wood with 2" hole to prevent the hole saw center from wandering. Use slow speed, plenty of cutting oil, and constant pressure. Bend center cover air louvers. Clamp a stiff straight edge to the bend line and a wide putty knife inserted under the louver as a metal brake.
IMG_8408.jpeg
IMG_8409.jpeg
IMG_8413.jpeg
IMG_8414.jpeg
IMG_8407.jpeg
Feb 24, 2023
Instrument panel layout
- (10 hours)
Category: Fuselage
Working with UpNorth Aviation for the past month laying out the instrument panel. The panel is ready to cut out.
IMG_8378.jpeg
Feb 19, 2023
Install control sticks
- (4 hours)
Category: Fuselage
Install left and right control sticks.
IMG_8363.jpeg
Feb 12, 2023
Aileron Trim
- (5 hours)
Category: Fuselage
Fabricate aileron trim control and mount.
IMG_8350.jpeg
Feb 11, 2023
Elevator tips
- (2 hours)
Category: Empennage
Attach left elevator tip. Drill and dimple right elevator tip. Cleco elevator tip. Ready to rivet.
IMG_8347.jpeg
IMG_8348.jpeg
IMG_8349.jpeg
Feb 11, 2023
Attach fresh air intakes
- (4 hours)
Category: Fuselage
Install fresh air intakes to fuselage
IMG_8343.jpeg
IMG_8344.jpeg
IMG_8345.jpeg
IMG_8346.jpeg
Feb 04, 2023
Steps and Brake Reservior
- (3 hours)
Category: Fuselage
Drill firewall, attach nut plates, and brake reservoir to firewall. Rivet left and right steps with help from Xander.
IMG_8291.jpeg
IMG_8292.jpeg
IMG_8289.jpeg
IMG_8293.jpeg
Feb 01, 2023
Install Stall Warn Hatch
- (1.5 hours)
Category: Wings
Dimple and rivet nut plates to hatch backing plate. Dimple hatch and wing hatch attach screw holes. Rivet hatch backing plate to wing and attach hatch.
Jan 23, 2023
Install Pitch Servo
- (2 hours)
Category: Fuselage
Rivet pitch servo mount to center skin brace. Attach pitch servo to elevator bell crank.
IMG_8272.jpeg
Jan 21, 2023
Install Roll servo, HS tips
- (4 hours)
Category: Fuselage
Rivet the horizontal stabilizer fiberglass tips. Install the roll servo in the right wing.
IMG_1439.jpg
IMG_1440.jpg
IMG_1441.jpg
Jan 20, 2023
Fabricate aileron push rods
- (3 hours)
Category: Wings
Test fit installing the aileron bell cranks in left and right wing. Fabricate two W-917 stick to aileron push tubes.
IMG_1436.jpg
IMG_1437.jpg
IMG_1438.jpg
Jan 11, 2023
Inventory Finishing Kit
- (3 hours)
Category: Fuselage
Received finishing kit yesterday. Inventory complete except for back ordered items.
Jan 01, 2023
Match drill panel angles
- (4 hours)
Category: Fuselage
Add nut plates and cleco attach angles between panel and fuselage. This is a temporary setup before committing to using the supplied panel. Cleco the angle joining the center rib with the middle subpanel.
IMG_1429.jpg
IMG_1431.jpg
IMG_1432.jpg
IMG_1433.jpg
IMG_1434.jpg
IMG_1435.jpg
Dec 31, 2022
Attach rudder pedals to rudder pedal assembly
- (1 hour)
Category: Fuselage
Attach 4 rudder pedals to the rudder pedal assembly.
Dec 31, 2022
Fit front deck
- (6 hours)
Category: Fuselage
Make attach angles, plate, and stiffening angle. Drill center rib to firewall. Deburr and fit left, center, and right ribs, left and right outboard subpanels, and center subpanel to fuselage. Check partial fit of forward top skin to verify fit with center rib.
IMG_1424.jpg
IMG_1425.jpg
IMG_1426.jpg
IMG_1427.jpg
IMG_1428.jpg
Dec 18, 2022
Mainly Crotch Straps and VS tip
- (7 hours)
Category: Fuselage
Drill to fuselage, deburr, install nut plates, and primer right and left crotch straps. Ready for riveting. Create a fiberglass 4 ply layup sheet to enclose the aft end of the vertical stabilizer tip. Cut and shape to fit inside tip. Trim rudder lower fiberglass tip to fit around rudder cable attach brackets. Drill rivet holes tip to lower rudder. Drill mounting hole for rear marker light/strobe.
IMG_1420.jpg
IMG_1421.jpg
IMG_1422.jpg
Dec 11, 2022
Mount Rudder to VS, install tail cone stiffeners
- (6 hours)
Category: Fuselage
Mount Rudder to Vertical Stabilizer. File rudder stops to ensure 35 degree rudder deflection. Measured 46 1/8" from rudder trailing edge to outboard elevator trailing edge. Unbolt HS and VS from fuselage and deburr all mounting holes. Install left and right rear tail cone stiffeners F-00773A: Look up installation on Van's website because drawings did not show, layout on fuselage, drill, dimple, and rivet stiffeners to fuselage.
IMG_1410.jpg
IMG_1412.jpg
IMG_1413.jpg
Dec 11, 2022
Mount steps to fuselage
- (1.3 hours)
Category: Fuselage
Cleco left and right steps to fuselage and bolts support blocks and steps to fuselage. Ready to rivet steps.
IMG_8103.jpeg
IMG_8104.jpeg
IMG_8105.jpeg
IMG_8106.jpeg
IMG_8096.jpeg
Dec 10, 2022
Drill Rear VS Spar to bulkhead
- (2 hours)
Category: Fuselage
Drill vertical stabilizer rear spar to rear bulkhead F-712.
Dec 08, 2022
Drill horizontal and vertical stabilizer to fuselage
- (2 hours)
Category: Fuselage
Drill vertical stabilizer front spar to F-981 attach plate. Drill horizontal stabilizer rear spar to Up elevator stop F-912C.
IMG_8109.jpeg
IMG_8110.jpeg
Dec 07, 2022
Mount horizontal and vertical stabilizer to fuselage
- (2 hours)
Category: Fuselage
Fabricate and mount Up Elevator Stop F-912. Mount attach plate F-981 to horizontal stabilizer forward spar. Trim vertical stabilizer forward spar Clamp the vertical stabilizer rear spar to to the back of builkhead F-912. Adjust vertical stabilizer such that the hinge line is colinear.
Dec 05, 2022
Steps and Vertical Stabilizeer
- (4 hours)
Category: Fuselage
Drill left step support block and deburr step. Prime left and right step. Restore the F-750R,L rear baggage cover plate nuts to the bulkhead. Both steps ready for permanent installation.
Bolt F-981 attach plate to horizontal stabilizer forward spar. Trim VS-702 vertical stabilizer forward spar as depicted in DWG 27A. Fabricate elevator stop F-912D.
Dec 03, 2022
Mount Left Step
- (8 hours)
Category: Fuselage
Complete drilling left step support block to floor rib. Drill 1 1/2" diameter holes through skin and two ribs, and trim two flanges to situate the step to the left fuselage. Remove F-650 rear side baggage cover; drilled out QB installed nutplates, to expose F-624 rib that will support riveting the step to the fuselage. Drill left step rivet and support blocks. Left and right step ready for priming and riveting.
IMG_8086.jpeg
IMG_8088.jpeg
Dec 02, 2022
Start Right Step Mount
- (3.3 hours)
Category: Fuselage
Drill 1 1/2" diameter holes through skin and two ribs, and trim two flanges to situate the step to the right fuselage. Remove F-650 rear side baggage cover; drilled out QB installed nutplates, to expose F-624 rib that will support riveting the step to the fuselage.
IMG_8083.jpeg
IMG_8082.jpeg
Nov 28, 2022
Fabricate Elevator Pushrod
- (4 hours)
Category: Empennage
Install F-635 bell crank. Fabricate F-790 pushrod. Mount the pushrod to the bell crank and elevator horns. With the elevator counterweights pinned to the horizontal stabilizer tips adjust the pushrod length by screwing in each rod end bearing until the bell crank is vertical. Tighten each rod end bearing jam nut. Remove the pushrod and store.
IMG_8069.jpeg
IMG_8072.jpeg
IMG_8070.jpeg
IMG_8071.jpeg
IMG_8073.jpeg
Nov 27, 2022
Fit Horizontal Stabilizer to Fuselage
- (6 hours)
Category: Empennage
Finish shaping HS-908L and R attach angles. Rivet angles to front horizontal stabilizer spar. Clamp the horizontal stabilizer to the fuselage and align it perpendicular to the longitudinal axis by measuring distance from each tip to the corner of the firewall. Measured distance for both 153 1/16". Drill the attach angles to the longerons and F710B angle. Fabricate the F-798 shims and slip them between the attach angles and the longerons. Raise the rear horizontal stabilizer spar using an 11/32" drill bit for a spacer. Clamp the rear spar to the F-711C bars and drill the attach holes. Measure again the distances from each horizontal stabilizer tip and the firewall corner. Left measures 152 7/8" and right measure 153 1/8".
IMG_8060.jpeg
IMG_8062.jpeg
IMG_8063.jpeg
Nov 23, 2022
Drill Elevator Horns
- (3 hours)
Category: Empennage
Fit elevators to horizontal stabilizer and pin in trail by clamping to the stabilizer tips. Measure the space between the elevator horns and create an aluminum spacer on the lathe that exactly fits between the horns and a #30 hole through the center. Remove the left elevator and drill a #30 pilot hole in the horn shown in DWG 27A. Remount the left elevator and clamp the counterweight arm to the stabilizer. Insert the aluminum spacer and align its hole with the pilot hole in the elevator horn. Drill through the spacer into the right elevator. Remove the spacer and enlarge both horn holes to full size. Measure the full up and full down elevator deflection.
IMG_8054.jpeg
IMG_8056.jpeg
IMG_8057.jpeg
Nov 23, 2022
Fit elevators to stabilizer
- (3 hours)
Category: Empennage
Install rod end bearings on right and left elevators. Attach right elevator to horizontal stabilizer and lock position in trail. Make a drill bushing to fit inside VA-146 central bearing. Drill elevator horn to central bracket. Remove right elevator and mount left elevator and lock position in trail. Drill elevator horn to central bracket. Remove left elevator. Enlarge to 1/4" both elevator horn to central bracket mounting holes.
Nov 19, 2022
More stands
- (5 hours)
Category: Workshop
Fabricated a tail cone support stand that fits inside the tail wheel socket. The fuselage can now be rolled freely. Create two stands to support the wing during installation. Experiment with plugging in the wing to the fuselage. Since the bottom skin is still not attached I did not fully insert the wing. Did verify the wing stands supports the wing during installation. Fabricated aileron and flap alignment tool.
JPEG image 22.jpeg
JPEG image 23.jpeg
JPEG image 27.jpeg
Nov 18, 2022
Created front fuselage stand
- (3 hours)
Category: Workshop
Fabricated fuselage stand to stabilize the fuselage and facilitate moving during construction.
JPEG image 19.jpeg
Nov 17, 2022
Engine Delivered
- (1 hour)
Category: Engine
Received engine from shipper. Inspected engine and accessories, and reviewed documentation.
JPEG image 18.jpeg
Nov 14, 2022
Inspect Quick Build Wings
- (4 hours)
Category: Wings
Inspect quick build wings for steps preparing the main spar, assembling the rear spar, preparing the wing ribs, assembling the wing skeleton, leading edge assembly, assembling the fuel tanks. Review steps to install the left fuel sender F-385 and the fuel pick up tube to the cover plate T-708.
Nov 12, 2022
Rivet rear bulkhead and rudder stops
- (7 hours)
Category: Fuselage
Rivet rear bulkhead F-712 to fuselage except for lower, inside rivets. Need pull rivets. Rivet rudder stops to fuselage. Add lightening holes to rudder pedal brace F-6118. Drill 3rd rudder position position. Split side rudder pedal bearing blocks. Since steps and flap parts are on back order, the next step appears to temporarily mount the wings and set the wing incidence.
JPEG image 17.jpeg
Nov 11, 2022
Fit tail wheel mount and rear bulkhead
- (4 hours)
Category: Empennage
Expand fuselage mousehole for tail spring mount WD-409. Bolt WD-409 to F-711. Fit rear bulkhead F-712 to fuselage and WD-409. Cleco and ready to rivet.
JPEG image 14.jpg
JPEG image 15.jpg
JPEG image 16.jpg
Nov 10, 2022
Forward covers
- (5 hours)
Category: Fuselage
Fit center floor F-982C, access plate F-982E, and heat baffle F-982C, and install nut plates and rivet. Rivet nut plates to fuel valve plate V-983A and screw to bulkhead F-904. Fit F-982C between center floor reinforcement angles and adjust to fit fuel valve cover F-983C. Drill F-982C to floor stiffener angles and firewall recess F-601K-1. Install all remaining nut plates. Do not trim fuel valve cover yet.
JPEG image 13.jpg
Nov 09, 2022
Seat backs and rests
- (4 hours)
Category: Fuselage
Rivet right and left seat backs and seat back braces. Add lightening holes to seat back braces. Match drill and dimple F-982E access plate and F-982 heat baffle to F-982C center cabin cover. Cleco nut plates to F-982C.
JPEG image 11.jpg
JPEG image 12.jpg
Nov 08, 2022
Seat backs and rests
- (4 hours)
Category: Fuselage
Rivet right and left seat backs. Fabricate two seat back rests; ready for riveting and lightening holes.
Nov 07, 2022
Build right seat back
- (3 hours)
Category: Fuselage
Drill, deburr, and prime right seat back assembly. Ready for riveting.
Nov 06, 2022
Tunnel cover & seat backs
- (10 hours)
Category: Fuselage
Riveted tunnel cover to side flanges and drilled to forward floor and attached nut plate. Completed preparing left seat; material cut, drilled, and deburred. Started right seat.
JPEG image 10.jpg
Nov 03, 2022
Harness cable wear blocks
- (4 hours)
Category: Fuselage
Fabricate parts and install F-6114B&C cable wear blocks.
Nov 02, 2022
Baggage Compartment
- (3.5 hours)
Category: Fuselage
Drill in place the forward top skin F-774 to bulkheads and stringers. Skip steps installing the steps which are back ordered. Install nutplates on F-706
Oct 30, 2022
Fitting forward top skin and F-6111 ribs
- (5 hours)
Category: Fuselage
Fit the F-7112 forward top skin to F-706 and F-707 bulkheads. Fit F-788 gusset. Ready to drill skin to bulkheads, stringers, and gussets. Trim and match drill F-6111 ribs to F-7112 skin.
JPEG image 6.jpeg
JPEG image 7.jpeg
JPEG image 8.jpeg
JPEG image 9.jpeg
Oct 30, 2022
Fabricate and fit elevator bell crank
- (2.5 hours)
Category: Fuselage
Trim F-757 gussets per plan Assemble and install elevator bell crank. Remove and store for use later. Quick build verify bell crank support, fitting aft top skin, and installing F-565L and R gusset plates.
Oct 29, 2022
Mount Rudder pedals in fuselage
- (5 hours)
Category: Fuselage
Drill mounting holes in rudder pedal end blocks and center support block. Cut center support block per drawing. Mount rudder pedals in fuselage and drill mounting holes 3" from firewall. Cut and drill rudder pedal support bracket and match drill for mounting to firewall. Drill support bracket to fit center support block. Inspect quick build fuselage steps: install floor stiffeners, framing baggage area, riveting forward side skins, finishing forward fuselage and longeron details, installing forward fuselage gussets, and installing should harness anchors. Mark side gussets F-757 to trim for cutout per drawing.
JPEG image 3.jpeg
JPEG image 4.jpeg
JPEG image 5.jpeg
Oct 25, 2022
Rivet rudder pedals
- (4 hours)
Category: Fuselage
Machine counter sink and rivet left seat right and left rudder pedals.
Oct 23, 2022
Fuselage
- (8 hours)
Category: Fuselage
Fabricate left and right F-792 rudder stops. Paint WD-409 tail spring bracket; ready to install. Fabricate left rudder pedal; ready to rivet. Inspected fuselage related to preparing and assembling the center fuselage and note instructions for preparing the step for installation (steps are back ordered), joining rear and center fuselage assemblies, adding the forward fuselage, installing auxiliary longerons and forward bulkheads.
IMG_7945.jpg
IMG_7946.jpg
Oct 22, 2022
Rivet Seat Adjustment Parts
- (2 hours)
Category: Fuselage
Bend seat adjustment plates with 4 degree bend per drawing. Rivet F-705J angle, F-705K plate, and F-705L seat adjustment supports to F-705F channel for right and left seats.
Oct 20, 2022
Aero Sport Power Build School Day 3
- (6 hours)
Category: Engine
Aero Sport Power Build School Day 3. Witness attaching propeller and remaining cabling and plumbing. Add oil to engine. Engine run for approximately 2.5 hours in three test runs with power between 70-100%.
IMG_7930.jpg
IMG_7932.jpg
Oct 19, 2022
Aero Sport Power Build School Day 2
- (5 hours)
Category: Engine
Aero Sport Power Build School Day 2. Assemble valve lifters, push rod tubes, pushrods, and rocker arms. Attach oil return lines and intake manifolds. Attach throttle body to crank case sump. Observe engine being mounted to test stand, attaching instrumentation, fuel, oil, and electrical cabling.
IMG_7894.jpg
IMG_7897.jpg
IMG_7898.jpg
IMG_7899.jpg
IMG_7902.jpg
IMG_7908.jpg
IMG_7917.jpg
IMG_7922.jpg
Oct 18, 2022
Aero Sport Power Build School Day 1
- (8 hours)
Category: Engine
Attend Aero Sport Build School in Kamloops, BC CA. Day 1: Assemble crankshaft, connecting rods, bearings, camshaft and join crankcase halves. Assemble accessory housing including timing gears, oil pump, oil filter mount, fuel pump, vacuum pad, and prop governor pad. Assemble pistons, wrist pins, and cylinders. Attach crankcase sump.
IMG_7843.jpg
IMG_7849.jpg
IMG_7853.jpg
IMG_7856.jpg
IMG_7863.jpg
IMG_7866.jpg
IMG_7872.jpg
IMG_7874.jpg
IMG_7883.jpg
Oct 15, 2022
Drill WD-409 keeper rivet holes
- (3 hours)
Category: Fuselage
Fit F-712 bulkhead and drill two rivet keeper holes through F-712 and WD-409
Oct 14, 2022
Begin WD-409 installation
- (4.5 hours)
Category: Fuselage
Relieve F-779 skin to make room for tail wheel spring mount tube. Match drill WD-409 to F-711
Oct 13, 2022
Inspect Bulkheads
- (3 hours)
Category: Fuselage
Deburr, machine countersink, and prime seat adjustment parts. Need to bend F-705K with 4 degree angle prior to riveting to fuselage. Inspect quick build bulkheads F706, F-707, F-708, F-709, F-710, F-711, and F-712. Remove F-712 bulkhead and review WD-409 tail wheel spring mount installation.
Oct 12, 2022
Seatback fabrication
- (4 hours)
Category: Fuselage
Fabricate two each F-705J, F705K, and F-705-l seat adjustment supports Inspect F-705 bulkhead construction.
Oct 10, 2022
Assembling F-904 Bulkhead
- (1.5 hours)
Category: Fuselage
Verify quick build assembly: F-904A,B,C,D snap bushing holes 5/8", F-904C-L&R bulkhead assembly, rivet F-904C, F-904D, and F-904G. Fit WD-610, WD-611, and WD-612; filed WD-610, W-D612, and both brass bearings to fit WD-611,
Oct 09, 2022
Assemble F-601 Firewall
- (6.5 hours)
Category: Fuselage
Step through F-601 firewall assembly instructions to verify quick build construction and familiarize with parts, and drawings, Fabricate F-601 TD brake line bracket, match drill, machine countersink, prime, and rivet to firewall. Drill two 7/16" holes through bracket and firewall for brake line fittings, Match drill and dimple firewall recess F-601K-1.
Oct 08, 2022
Inventory Wings
- (5.8 hours)
Category: Wings
Complete fuselage inventory. Perform and complete the wings inventory. Generate an inventory discrepancy list,
Oct 07, 2022
Inventory Fuselage and Wings
- (5 hours)
Category: Fuselage
Receive quick build wings and fuselage, Store parts in hangar and begin inventory,
Oct 06, 2022
Build Wing Cradke
- (4 hours)
Category: Workshop
Build wing cradle, Fuselage and wings scheduled to arrive tomorrow.
wing cradle.jpg
Oct 01, 2022
Prepare hangar for QB fuselage and wings
- (2 hours)
Category: Workshop
Clean hangar and prepare for receiving quick build fuselage and wings this week.
Jul 13, 2022
Cut Trim Tab Rod
- (2 hours)
Category: Empennage
Cut the trim tab actuating rode and verify travel up and down.
IMG_7655.jpg
IMG_7656.jpg
IMG_7657.jpg
Jul 13, 2022
Mount Trim Servo Motor
- (2 hours)
Category: Empennage
Attach trim servo motor to mounting brackets and cover plate.
67934950043__9B92A2FD-7C14-4352-9190-82E4259B87EF.jpg
IMG_7650.jpg
Jul 11, 2022
Assemble Trim Tab
- (2.5 hours)
Category: Empennage
Rivet the lower trim tab spar and bottom trim tab skin. Glue two foam ribs inside trim tab skin with Proseal. Rivet the top trim tab spar, hinge, and top trim tab skin. Place trim tab in V-blocks.n
IMG_7643.jpg
IMG_7645.jpg
IMG_7646.jpg
IMG_7648.jpg
Jul 10, 2022
Left Elevator & Trim Tab
- (10 hours)
Category: Empennage
Rivet gusset, bottom skin to elevator spar. Rivet bottom skin to elevator trim spar. Match drill bottom elevator skin and trailing edge to the top skin. Deburr and dimple the trailing edge skin and machine countersink the trailing edge. Match drill, deburr, and dimple overlapping skin stiffeners outboard of the trim tab. Apply proseal to trailing edge and cleco trailing edge and upper and lower skins to a match drilled stiffener angle. Match drill hinge to upper elevator spar. Trim trim tab horns for electric trim. Bend trim tab ends to close the trim tab inboard and outboard ends. Match drill bottom trim tab skin and trim tab spar, and top trim tab skin, hinge, and trim tab spar. Deburr and dimple trim tab skins and lower trim tab spar. Machine countersink the upper trim tab spar. Rivet the trim tab horns to the lower trim tab skin Trim two foam ribs to fit within trim tab and scuff the aluminum in preparation prior to installing the ribs.
Jul 08, 2022
Rivet Left Elevator
- (8 hours)
Category: Empennage
Deburr and dimple elevator spar, counterbalance ribs, root rib, trim tab spar, and skin, Back rivet stiffeners to top skin. Rivet top skin to spar, counterbalance to spar, and control horn to spar. Back rivet stiffeners to bottom skin. Rivet trim reinforcement plate to bottom skin.
Jul 07, 2022
Begin Assembling Left Elevator
- (2 hours)
Category: Empennage
Cleco left elevator skin to elevator spar, trim tab spar, counterbalance assembly, and root spar. Match drill all holes. Begin riveting counterbalance assembly.
Jul 06, 2022
Bend Elevator Trim Skin
- (2 hours)
Category: Empennage
Create bending brake on workbench. Bend elevator trim skin to fit foam ribs and plywood clamps.
IMG_7633.jpg
IMG_7634.jpg
IMG_7635.jpg
IMG_7636.jpg
IMG_7637.jpg
IMG_7638.jpg
Jul 06, 2022
Rivet Right Elevator Trailing Edge
- (2.5 hours)
Category: Empennage
Rivet right elevator trailing edge.
IMG_7631.jpg
IMG_7632.jpg
Jul 05, 2022
Create Elevator Trim Rib and Clamp
- (1.5 hours)
Category: Empennage
Cut two elevator trim tab clamps from 3/4" plywood. Cut two elevator trim tab ribs from supplied foam. Both ribs left long on forward edge.
IMG_7627.jpg
Jul 03, 2022
Rivet Right Elevator Trailing Edge
- (1.5 hours)
Category: Empennage
Apply proseal to trailing edge wedge and cleco skins and trailing edge to angle stiffener.
67855624964__10F4B07E-9E91-49A9-A756-B8D8E9BB7D07.jpg
Jul 02, 2022
Rivet Right Elevator
- (7.5 hours)
Category: Empennage
Rivet stiffeners to top and bottom right elevator skin. Rivet top and bottom elevator skin to spar. Rivet elevator outer rib to spar. Partially rivet elevator skin to inboard and outboard ribs. Match drill trailing edge wedge to trailing edge elevator skin. Dimple trailing edge skin and machine countersink trailing edge wedge. Deburr and clean skin and wedge surfaces. Ready to proseal wedge and trailing edge.
Jun 29, 2022
Right Elevator Skeleton
- (3 hours)
Category: Empennage
Deburr and dimple right elevator skin, ribs, and spar. Rivet counterbalance ribs and skins. Rivet elevator horn to spar and inboard rib.
Jun 28, 2022
Right Elevator & Rudder
- (5 hours)
Category: Empennage
Match drill right elevator skin, spar, and ribs. Ready to deburr and dimple. Form the rudder leading edge, match drill, deburr and rivet. Rudder complete except for tip.
Jun 27, 2022
Rivet rudder trailing edge
- (2 hours)
Category: Empennage
Clean proseal from rudder trailing edge rivet holes. Rivet rudder trailing edge using a hand squeezer with dies ground to match the rudder trailing edge angle.
IMG_7617.jpg
Jun 25, 2022
Begin building right elevator
- (6 hours)
Category: Empennage
Assemble left and right elevator counterbalance arms; match drill, debur, and dimple parts. Dimple right elevator skin for stiffeners. Assemble right elevator skeleton and cleco to right elevator skin.
Jun 24, 2022
Rivet rudder trailing edge and skin to ribs
- (4.7 hours)
Category: Empennage
Clean rudder trailing edge and skin. Attach trailing edge with proseal and cleco to supporting angle. Rivet rudder skins to ribs. Flute left and right elevator wing tip ribs and fit counterbalance skin.
IMG_7608.jpg
IMG_7610.jpg
Jun 23, 2022
Rivet rudder skeleton and skin
- (5 hours)
Category: Empennage
Rivet rudder skeleton and install rudder counterweight. Rivet rudder skin to spar only. Defer riveting rudder skin to ribs until after the trailing edge has been completed.
Jun 22, 2022
Prepare rudder skins and trailing edge
- (2.5 hours)
Category: Empennage
Dimple rudder skins. Machine countersink trailing edge. Fit rudder counterweight to counterweight rib. Fabricate counterweight hold down strap.
Jun 21, 2022
Match drill and deburr rudder
- (2.5 hours)
Category: Empennage
Match drill rudder skins and skeleton. Deburr holes and dimple ribs.
Jun 19, 2022
Rivet VS skin, assemble rudder
- (6 hours)
Category: Empennage
Rivet VS skin to VS spar and ribs. Rivet rudder stiffeners to rudder skins. Cleco rudder skins to skeleton. Ready to match drill.
IMG_7598.jpg
IMG_7600.jpg
Jun 18, 2022
Assemble Vertical Stabilizer
- (6.5 hours)
Category: Empennage
Rivet VS spar, doubler, ribs, hinge brackets. Cleco VS skin to spar and ribs.
IMG_7593.jpg
IMG_7594.jpg
Jun 17, 2022
Build Vertical Stabilizer
- (3.3 hours)
Category: Empennage
Flute ribs. Cleco front and rear spars, spar doubler, ribs, hinge brackets. Match drill and debur all holes.
Jun 09, 2022
Match drill right elevator skin and skin stiffeners
- (2 hours)
Category: Empennage
Match drill right elevator skin and skin stiffeners. Mount the C-Frame to allow clearance to dimple elevator skins.
Jun 09, 2022
Prep right elevator skin
- (2 hours)
Category: Empennage
Remove blue film from rivet lines and cleco skin stiffeners to skin in preparation to match drill.
Jun 07, 2022
Start Rudder Skeleton
- (4 hours)
Category: Empennage
Cleco and match drill rudder skeleton up to attaching the rudder skins. Still awaiting tape before back riveting the stiffeners to the rudder skins.
Jun 07, 2022
Finished HS
- (1.25 hours)
Category: Empennage
Pictures did not upload on previous entry
Jun 07, 2022
Finished riveting hs
- (1.25 hours)
Category: Empennage
Finished riveting hs
Jun 06, 2022
Rivet HS skins to ribs and rear spar
- (4.5 hours)
Category: Empennage
Rivet HS skins to ribs and rear spar
Jun 05, 2022
Rivet HS skin to forward spar
- (1.5 hours)
Category: Empennage
Completed riveting left and right HS skin to forward spar.
Jun 04, 2022
Rivet HS skin to front spar
- (2 hours)
Category: Empennage
Rivet HS skin to front spar.
Jun 04, 2022
Rivets
Category: Empennage
Jun 04, 2022
Rivet he skin
Category: Empennage
May 23, 2022
Rivet front HS spar to nose ribs
- (2 hours)
Category: Empennage
Rivet front HS spar to nose ribs.
May 22, 2022
Prepare to rivet HS skin to spars,
- (4 hours)
Category: Empennage
Rivet mid span ribs to front HS spar. Cleco front spar to skin. Ready to rivet
IMG_7532.jpg
May 21, 2022
countersinking, nose ribs, elevator trim access plate
- (12 hours)
Category: Empennage
Machine countersink both horizontal spars. Rivet elevator nose ribs to skin. Dimple left elevator skin. Countersink and Install nut plates on elevator trim access panel.
IMG_7527.jpg
IMG_7528.jpg
IMG_7529.jpg
May 18, 2022
Elevator, rudder preparaton
- (5 hours)
Category: Empennage
Drill and debur elevator and rudder spars. Debur and cleco rudder skin stiffeners.
IMG_7516.jpg
IMG_7517.jpg
IMG_7518.jpg
May 17, 2022
Empennage assembly
- (6 hours)
Category: Empennage
Rivet front horizontal spar. Cleco the rear spar and ready to rivet.
IMG_7514.jpg
IMG_7515.jpg
May 16, 2022
Empennage parts preparation
- (5 hours)
Category: Empennage
Finished match drilling rib and spars. Disassemble ribs, spars, hinge brackets. Deburr all holes and edges.
May 15, 2022
Horizontal Stab
- (6 hours)
Category: Empennage
Cleco forward and rear horizontal stab spars and ribs. Match drill ribs, elevator hinge brackets, doubler.
May 14, 2022
Received Kit-Inventory
- (4 hours)
Category: Empennage
Received empennage. Performed kit inventory. All parts accounted for except vertical stab spar back ordered.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.