Total Hours:1181.4
Total Flight Time:
Total Expense:$2.00
Start/Last Date:May 14, 2022 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=nburkholder

Home or Last Project Picture

Sep 02, 2023     More Panel Wiring - (3 hours)       Category: Instrument Panel
Wire the copilot mic and headphone jacks. Wire the auxiliary power socket. Wire the USB power socket.


 
Sep 01, 2023     Primary Power to panel - (2 hours)       Category: Instrument Panel
Replace the dual split bus bar connecting circuit breaker switches on front panel with a one piece bus bar. Wire bus bar to primary power distribution header. Wire pilot side microphone and headphone panel jacks.


 
Aug 31, 2023     Lighting and Panel power - (2 hours)       Category: Instrument Panel
Fabricate two copper bus bars to connect panel circuit breaker switches. Connect strobe, landing, and position light wiring to corresponding panel circuit breaker switches. Connect wig-wag wire to panel mounted switch.


 
Aug 27, 2023     Instrument Panel attachment bracket - (1.5 hours)       Category: Instrument Panel
Fabricate a mounting tab that attaches to the instrument panel right side to the right fuselage attachment bracket. The tab fastens the instrument panel lower lip to the right fuselage bracket. I cut the panel to facilitate installation. The mounting tab uses 2 #8 screws and nutplates to fasten the panel lip to the fuselage.


 
Jul 22, 2023     primary bus avionics fuse block - (2 hours)       Category: Instrument Panel
Fabricate mounting plate identical to secondary fuse block mounting plate to hold primary avionics bus fuse block. Mount fuse block to left side of subpanel.


 
Jul 21, 2023     secondary avionics bus fuse block - (3 hours)       Category: Instrument Panel
Fabricate a mounting plate for the secondary avionics bus fuse block. Mount fuse block and secondary bus master relay. Mount plate to right side of subpanel.


 
May 23, 2023     Avionics and display mounts - (3 hours)       Category: Instrument Panel
Drill and rivet display mounts to instrument panel. Fabricate angle mounts for avionics trays and rivet to instrument panel. Place avionics in panel for test tit.


 
May 19, 2023     Fabricate panel mounting angles - (1.5 hours)       Category: Instrument Panel
Fabricate panel to fuselage mounting angles


 