Project: I-CAVS   -  
            Listing for Category : Controls
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Feb 25, 2024     38-8 Rudder Pedals and brake system step 1-5 - (2 hours)       Category: Controls
Installed the plastic snap bushing. Installed the two clamps at the F-1011 Bulkhead. Installed the two plastic sleeves in the Tailbone side skin ovals. Torqued the Bolt for both clamps.
Routed the two cables towards the cockpit. Installed the two clamps in the tunnel to hold the last sleeve in the pilot-copilot sides of the tunnel


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.