Project: I-CAVS   -  
            Listing for Category : Engine
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Mar 29, 2024     FF1_10 Engine Installation - (1 hour)       Category: Engine
Glued the fiberfrax steel foil assembly to the firewall (top area). Used aluminum adhesive foil to cover the fiberfrax gap.
Installed the brake reservoir with the necessary spacer.
Installed both ANL and the shunts.
Installed the steel air valve.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.