Project: I-CAVS   -  
            Listing for Category : Fuselage
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Apr 01, 2024     45-18 Cabin Door Windscreen step 5 - (2 hours) Category: Fuselage
prepared few additional aluminum clips for the windscreen.
Test installation of the windscreen with clips and clecos. Adjusted positioning. Drilled the holes for the clips and deburred the holes. Used screw-clecos as stronger pressure control compared to the normal spring clecos.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.