EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
I-CAVS
-
Listing for Category : Fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (854)
Research
Workshop
- (13)
Fuselage
- (385)
Firewall
- (21)
Tail Feathers
- (167)
Wings
- (87)
Controls
- (22)
Avionics
- (11)
Electrical Syst.
- (3)
Instrument Panel
- (5)
Landing Gear
- (19)
Engine
- (21)
Propeller
- (2)
Fuel System
- (9)
Interior Finish
- (17)
Paint / Decals
- (1)
Inspection
Tools
- (3)
Auto Entry
SB & Letters
- (14)
Equipments
- (2)
Brake System
- (31)
Doors
- (21)
Builder Name:
paolo cavosi
-
Project:
Vans - RV-10
Total Hours:
2448.7
Total Flight Time:
Start/Last Date:
May 28, 2019 - No Finish Date
Engine:
IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:
MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:
Garmin G3X
Friendly URL:
https://eaabuilderslog.org?s=I-CAVS
Home or Last Project Picture
Apr 15, 2024
45-19 Cabin Door Windscreen door sensor installation
- (2 hours)
Category: Fuselage
Started the installation of the Installed the door sensors. All the electrical wiring will be done when installing the avionics.
All the sensor have been tested for positioning and continuity. Magnets are installate without use of epoxy or any glue.
IMG_0326.jpeg
IMG_0327.jpeg
IMG_0328.jpeg
RV-10 Door latch indicator VANS.pdf
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.