Project: ranss19   -  
            Listing for Category : cowling
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Ken Jordan   -  
Project:   Rans - S-19 Venterra   -   VIEW REPORTS
Total Hours:3
Total Flight Time:
Start/Last Date:Jan 06, 2012 - Aug 02, 2015
Engine:Lycoming IO233
Propeller:Sensenich
Panel:Dynon Skyview; Garmin 430
 
Friendly URL: https://eaabuilderslog.org?s=ranss19

Home or Last Project Picture

Oct 06, 2014     Cowling assembly       Category: Cowling
Drilled #40 holes for the rivets for the receptacles and nut plates. Cleaned all the holes. Installed the receptacles and nut plates. Installed the studs. We ended up with 4 extra holes, so ordered 4 more sets of studs from RANS!


 
Oct 04, 2014     Cut the hole for the oil check door Category: Cowling
Cut the hole for the oil check door. Drilled #30 for the rivets. Cleaned and primed and riveted. Formed the flexible baffling strips around the top on the baffle and riveted. Continued work on the exhaust system.
 
Oct 02, 2014     Finished fitting the top cowling Category: Cowling
Finished fitting the top cowling. Drilled all holes to #11. Took the cowling off and drilled the receptacle holes to 5/16" and stud holes to 1/4"
 
Sep 29, 2014     Finished fitting the lower cowling       Category: Cowling
Finished fitting the lower cowling. Reconfigured some parameters in the Dynon system (with Aerotronic's help!). Started fitting the upper cowling. We had to remove the engine hoist points to get the upper cowling to lie flat.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.