Builder Name:Ken Jordan   -  
Project:   Rans - S-19 Venterra   -   VIEW REPORTS
Total Hours:3
Total Flight Time:
Start/Last Date:Jan 06, 2012 - Aug 02, 2015
Engine:Lycoming IO233
Propeller:Sensenich
Panel:Dynon Skyview; Garmin 430
 
Friendly URL: https://eaabuilderslog.org?s=ranss19

Home or Last Project Picture

May 27, 2014     Antennas       Category: Fuselage
Installed the second GPS antenna aft of the first one. Also installed two comm antennas, transponder antenna, and ADS-B antenna and started on the marker beacon antenna


 
Feb 12, 2014     Parts inventory       Category: Fuselage
Received and inventoried seat kit, canopy kit, panel fan kit, key lock kit, grey interior kit, decals, firewall soundproof panels, windshield hold down strip, canopy side strips, remote charging post, seat headrest kit and shorter pilot kit. Missing one of the two shorter pilot kits. Called RANS and they are shipping another one.


 
Feb 10, 2014     Belly fairings       Category: Fuselage
Cut out belly fairings and located/drilled/attached the nut plates. Clecoed the baggage and seat/ramp skins


 
Feb 05, 2014     Installed and riveted the top of bulkhead #1       Category: Fuselage
Installed and riveted the top of bulkhead #1. The foam came in so finished putting foam on the skin surfaces between bulkheads 1 & 2 and 2 & 3. Clecoed tailcone top skin in place. Installed gascolater on forward side of firewall.


 
Feb 04, 2014     Tech Counselor Category: Fuselage
Tech counselor fuselage inspection
 
Feb 03, 2014     Foam Category: Fuselage
Put foam insulation in the tail section until we ran out of foam. Ordered more from Aircraft Spruce.
 
Dec 10, 2013     Floor assembly       Category: Fuselage
Pulled parts for forward fuselage floor and began drilling and fitting.


 
Nov 20, 2013     Longerons & bulkhead Category: Fuselage
Primed the longerons and bulkhead tops and rear deck
 
Nov 12, 2013     Lower channels & stringers       Category: Fuselage
Riveted inspection rings and nut plates to side and belly skins. Riveted lower channels to skin stringers. Riveted bulkhead #5 together. Attached to frame and stringers and riveted/bolted together


 
Nov 10, 2013     Priming parts       Category: Fuselage
Finished cleaning the pieces and primed them.


 
Nov 09, 2013     Bulkhead # 5       Category: Fuselage
Assembled bulkhead #5 and clecoed into place on the tailcone. Drilled holes to #30, reamed bolt holes to 3/16 or 1/4 as required. Took everything apart and started cleaning.


 
Nov 08, 2013     Rudder cable, inspection plates, side skin       Category: Fuselage
Routed rudder cable through fair leads in center fuselage. Pulled parts for the tailcone. Bent side skins - took 6 people total, 2 to turn the tube and 4 to keep the skin firmly pressed down on the bench. Drilled out holes for inspection panels. Clecoed everything together. Discovered that we rolled the skins the wrong way, which puts the inspection panel on the right side. Also KPFU0453 seems to be bent the wrong way. Sent Ed @ RANS a note on both these issues. Also pulled part KPCS0242 to rivet during this phase.


 
Jul 11, 2013     Kit arrival       Category: Fuselage
Opened the package and counted/stored the contents. Large pieces are in the second bedroom, medium pieces nailed to the plywood in the garage, and small pieces in labeled drawers in the garage.


 
Jul 10, 2013     Kit Arrived       Category: Fuselage
The fuselage kit came! We rolled the building tables out to the truck and the delivery man pushed the box out onto our table. Ken, Dave, Norm & Dan helped roll the table back into the garage.


 
Mar 01, 2013     Ordered the fuselage kit. Category: Fuselage
Ordered the fuselage kit.
 