Builder Name:Ken Jordan   -  
Project:   Rans - S-19 Venterra   -   VIEW REPORTS
Total Hours:3
Total Flight Time:
Start/Last Date:Jan 06, 2012 - Aug 02, 2015
Engine:Lycoming IO233
Propeller:Sensenich
Panel:Dynon Skyview; Garmin 430
 
Friendly URL: https://eaabuilderslog.org?s=ranss19

Home or Last Project Picture

Nov 28, 2014     Plugs and engine run Category: Engine
Tech Counselor stopped by with the cleaned plugs. Replaced all plugs. Tested the electronic ignition to identify correct HT wires for each plug. Tested engine which ran much more smoothly
 
Nov 21, 2014     Air filter install Category: Engine
Cut and drilled the lower cowling for the install of the air filter. Riveted a doubler on the front to support the filter frame.
 
Nov 20, 2014     Plugs & lubing Category: Engine
Our Tech Counselor stopped by to help with the engine. Several spark plugs were fouled. Our TC took the aviation plugs with him to clean them and we bought 4 new plugs for the electronic ignition. Discovered that the fuel pressure gauge was connected to the wrong place, so plugged the old place and order a T connector to connect it correctly. Lubed all the hinges.
 
Nov 04, 2014     Prop and oil       Category: Engine
Started cutting and attaching the servo push-pull rods, but realized one of the rod ends needed to be 1/4", so have ordered those from Spruce. Installed the prop. Filled the engine with oil and cranked to move the oil through the engine. We have oil pressure and temperature!


 
Nov 03, 2014     Wiring and gas lines Category: Engine
Drilled separate holes in the side skin for the gas lines and clipped them away from the aileron control lines. Replaced the landing light switch with a dual landing/taxi light switch. Ran the wires out to the engine compartment.
 
Oct 06, 2014     Wiring and exhaust       Category: Engine
In checking some of the wiring, we found that the MAP sensor wires were loose. Got new pins and soldered them in addition to crimping and re-installed. Installed the exhaust hangers and completed work on the exhaust system.


 
Aug 11, 2014     Mounted and wired the oil pressure sensor       Category: Engine
Mounted and wired the oil pressure sensor. Finalized the pilot and co-pilot control stick and re-installed. Did some miscellaneous wiring.


 
Aug 08, 2014     Installed fuel pressure sensor       Category: Engine
Installed fuel pressure sensor. Installed the aux fuel pump. Plumbed and wired the manifold pressure sensor. Plumbed the manifold pressure sensor for the electronic ignition. Installed the fuel line from the gascolator to the mechanical fuel pump.


 
Aug 06, 2014     Installed engine crank case oil breather.       Category: Engine
Installed engine crank case oil breather.


 
Jul 14, 2014     Engine attachments       Category: Engine
Installed the correct oil temperature probe (UMA 1B9) for the Lycoming IO233 engine. Installed the cabin heater box and connected to the heat shroud on the muffler. Installed cabin heat cable.


 
Jul 09, 2014     Mixture Control and Throttle       Category: Engine
Installed mixture control cable and throttle cable


 
Jul 05, 2014     Engine attachments       Category: Engine
Installed the exhaust system and dry fit the mufflers. Drilled and installed the EGT probes. Installed the CHT/EGT harness, installed blade connectors and attached to the probes. Clamped and tied all the wires.


 
Jul 03, 2014     Trim Tab and Electronic Ignition       Category: Engine
Installed Molex connector on the trim tab servo wires and tied to side of tailcone. Ran electronic ignition sensing wire over the engine and through the firewall to the electronic ignition control unit.


 
Jul 02, 2014     Installed bungs in the firewall and baffling Category: Engine
Installed bungs in the firewall and baffling
 
Jul 01, 2014     Engine attachments       Category: Engine
Mounted the oil cooler and ran scat tubing from the baffle to the cooler. Re-mounted the throttle assembly using sealant on the gasket. Installed the throttle, mixture and parking brake knobs


 
Jun 20, 2014     Drilled the tube input for the oil cooler       Category: Engine
Drilled the tube input for the oil cooler. Drilled mounting holes in the firewall and fabricated bushings to give it air movement. Mounted the throttle body assemble to the engine. Installed the cylinder head temperature probes.


 
Jun 19, 2014     Finished riveting the baffle       Category: Engine
Finished riveting the baffle. Attached to engine


 
Jun 17, 2014     Baffles Category: Engine
Painted the baffle pieces with black engine enamel
 
Jun 16, 2014     Finished fitting the baffling Category: Engine
Finished fitting the baffling. Ran out of rivets so we're waiting on those. All pieces are cleaned and ready to be painted.
 
Jun 14, 2014     Baffles Category: Engine
Started fitting the baffling to the engine and riveting pieces together as needed
 
Jun 10, 2014     Clamped the static port lines to the aircraft       Category: Engine
Clamped the static port lines to the aircraft. Installed the OAT probes and connected to the ADAHRS units


 
Jun 03, 2014     Installed LightSpeed Ignition module       Category: Engine
Fabricated a mounting plate for the LightSpeed Plasma CD Ignition module. Mounted just aft of the firewall. Bolted the ignition coils to the top of the engine. Installed the spark plug adapters.


 
May 30, 2014     Mounted the engine using Lord's isolators       Category: Engine
Mounted the engine using Lord's isolators. Fabricated a backing plate for the battery box and mounted it behind the luggage closeout. Fabricated a backing plate for the marker beacon antenna and riveted to tail skin. Fabricated a mounting plate for the ADAHRS units and mounted them.


 
May 07, 2014     Baffles Category: Engine
Cleaned up the pieces and made the compound bends by hand.
 
May 06, 2014     Used a break to put the bends in Category: Engine
Used a break to put the bends in. Couldn't do the compound bends with the break.
 
May 03, 2014     Baffles Category: Engine
Drilled the holes in the baffling except for the #18 holes. We've ordered a #18 bit!
 
May 01, 2014     Baffles Category: Engine
Punched the center of the holes that need to be drilled in the baffling
 
Apr 29, 2014     Baffles       Category: Engine
Used a belt sander to get the baffling pieces to their finished size. Sanded all the edges smooth.


 
Apr 28, 2014     Baffles       Category: Engine
Used a band saw to rough cut all the baffling pieces out.


 
Apr 25, 2014     Baffles Category: Engine
Marked up the IO233 baffle blueprints so we could read them. Copied them onto letter paper and cut the pieces out. Traced the pieces onto aluminum/stainless steel sheets
 
Dec 08, 2013     Firewall assembly Category: Engine
Cleaned/de-burred firewall parts and primed them.
 