Project: ranss19   -  
            Listing for Category : vstab
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Ken Jordan   -  
Project:   Rans - S-19 Venterra   -   VIEW REPORTS
Total Hours:3
Total Flight Time:
Start/Last Date:Jan 06, 2012 - Aug 02, 2015
Engine:Lycoming IO233
Propeller:Sensenich
Panel:Dynon Skyview; Garmin 430
 
Friendly URL: https://eaabuilderslog.org?s=ranss19

Home or Last Project Picture

Nov 19, 2013     V stab install       Category: VStab
Drilled the mounting holes for the vertical stabilizer. Checked the alignment of the stabilizer. Clecoed the read deck and drilled out. Took everything off including the longeron and cleaned.


 
Jan 28, 2012     Re-assembled parts with clecos and riveted the skins       Category: VStab
Re-assembled parts with clecos and riveted the skins. We have a finished stabilizer!


 
Jan 26, 2012     Skin - (3 hours)       Category: VStab
Drilled and clecoed the skin to the vertical stabilizer frame. Removed and deburred all parts. Removed the plastic from the back of the skin and on the front from around the rivet holes. Sprayed the parts with the 2-part epoxy primer


 
Jan 19, 2012     Clecoed the jigs to the frame and laid the skin on top       Category: VStab
Clecoed the jigs to the frame and laid the skin on top. Transfer drilled the holes along the rear spar and marked the orientation of the side skins. Pulled all the parts needed for the skin installation


 
Jan 14, 2012     Cleaning and preping       Category: VStab
Drilled all holes with the #30 drill, cleaned and deburred all holes. Sprayed all parts with 2-part epoxy and let dry.


 
Jan 12, 2012     Fitting       Category: VStab
Laid all the pieces out and checked how they all fit together. Transfer drilled the stabilizer bars on the rear spar and clecoed the entire frame together


 
Jan 08, 2012     General Starting Instructions       Category: VStab
Pulled all the parts for the vertical stabilizer frame and laid them out on our work surface to see how they fit together. EAA Technical Counselor stopped by with a copy of AC 43.13 - 1B/2A - Aircraft Inspection, Repair and Alterations. He went through the basic steps we'll need to follow:
1) fit pieces together & Clec0
2) drill as necessary
3) take apart and clean/debur
4) spray the inside of ALL parts with 2-part epoxy primer (most of the S19's life will be in Florida. This was recommended to reduce the likelihood of corrosion). This will add to the base weight but will be well worth the effort.
5) reassemble and cleco
6) rivet


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.