Builder Name:Ken Jordan   -  
Project:   Rans - S-19 Venterra   -   VIEW REPORTS
Total Hours:3
Total Flight Time:
Start/Last Date:Jan 06, 2012 - Aug 02, 2015
Engine:Lycoming IO233
Propeller:Sensenich
Panel:Dynon Skyview; Garmin 430
 
Friendly URL: https://eaabuilderslog.org?s=ranss19

Home or Last Project Picture

Aug 16, 2014     Battery       Category: Electrical
Fabricated and installed power cables from battery to ground, battery to master relay, master relay to shunt. Also wired the alternator to shunt. Added mag wiring to P1 plug.


 
Aug 12, 2014     Battery       Category: Electrical
Installed the remote charging post near the battery behind the baggage side compartment. Fabricated and installed a grounding plate for the battery.


 
Aug 09, 2014     Wired amp meter leads to shunt Category: Electrical
Wired amp meter leads to shunt. Re-wired pilot's control stick to correct orientation of grip. Installed and timed mags to lower spark plugs with the help of our tech counselor.
 
Jul 25, 2014     Wiring Category: Electrical
Ran wires from the ELT and starter motor to the P1 plug and connected
 
Jun 12, 2014     Ran coax from various antennas to the panel Category: Electrical
Ran coax from various antennas to the panel
 