Clecoed the center skins, rib, etc. in place. Joggled KPFU0428 to accommodate the longerons. Bent forward longerons using the dies. Transfer drilled #40 to bulkhead gusset and side skin. Fabricated shims and clecoed gussets and shims in place. Clecoed belly skin and gussets in place.