Continued to install cam lock receptacles, sleeves and match drilling holes from brackets. Sam continued his work on the baffles priming mating parts and riveting the doubler plates. Began match drilling holes in bottom of bottom cowling. Also pushed cowling up to get 1/8” engine predroop dimension. Installed both cowls, hinge pins, and inlet rings to confirm fit. Pic of front of cowl looks BADASS. IMHO haha