Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1458.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Jan 29, 2021     FAB transit duct inner wall - (3 hours)       Category: Firewall
Masked off the bottom of the FAB back plate so I could build up the inner wall of the transit duct. I used some plastic washers to simulate the thickness of the the bolt heads and installed the transit duct. Mixed up some epoxy with cotton flox and filled in the gap. I'll trim down the edges once dry. Used some of the leftover to fill in a gap I have at the front of the cowling


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.