Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1458.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Jan 30, 2021     FAB transit duct wall and nut plates - (3 hours)       Category: Firewall
Cleaned up the inner wall of the transit duct and sanded down the outside edge for a better fit with the back plate. Fits very snuggly inside the back plate so I'm not sure if I need to secure it or not. Match drilled the #40 holes in the outer wall of the filter housing to the back plate to #21 for nut plates and #8 screws. Installed the nut plates and temp installed on the fuel servo. All seems well except securing of top screw on filter housing due to close access. Need to get a shorty #15 Torx bit reach the top screw


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.