Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1458.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Jan 10, 2021     FAB installation - (2 hours)       Category: Firewall
Worked on FAB fit with lower cowling. In order to ensure a smooth transition from the lower cowling inlet to the FAB transit duct the transit duct had to be adjusted down and to the left. Drilled 5 #40 holes in the edge of transit duct and into the back plate. Fit again with lower cowl and match drilled to #30. Need to do something about a couple holes that have edge distance issues.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.