Worked on FAB fit with lower cowling. In order to ensure a smooth transition from the lower cowling inlet to the FAB transit duct the transit duct had to be adjusted down and to the left. Drilled 5 #40 holes in the edge of transit duct and into the back plate. Fit again with lower cowl and match drilled to #30. Need to do something about a couple holes that have edge distance issues.