Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1458.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Jan 25, 2021     FAB fitting - (2 hours)       Category: Firewall
Removed the tape from back plate of FAB. Sanded down the edge to fit with the filter housing. Installed on fuel injector to fit with the air inlet duct. Marked the intersection and drilled thru both back plate and filter housing to #40 for nut plates later. Reinstalled on the injector to check fit with aluminum inlet duct on lower cowl. Lined up well finally. Bottom right pic is shot of filter housing inside the lower cowl. Bottom left pic is front shot of lower cowl air inlet


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.