Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1458.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Mar 02, 2022     Cowl hinge pins and firewall pass thru - (4 hours)       Category: Firewall
Secured cowling side hinge pin guides using smaller Adel clamps and some RTV sealer at the firewall. Only had a dg2 and 3 Adel clamps. The dg3 is the perfect size for the stainless tubing and I made the dg2 work, but need to order some dg3 clamps for the Bowden cables as well so I'll replace the 2 when I get those. Made a hole for one of two firewall pass throughs using a step drill and finishing with a hole punch. Used a location from an existing hole I covered. The previous owner mislocated the hole for the brake reservoir which was not supported by an aluminum angle, so after putting the reservoir in the proper location I had an extra hole in the firewall. There may be a problem with it interfering with removing or installation of the battery, but I'll deal with that when I get my battery. May have to trim the battery tray.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.