Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1458.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Apr 28, 2022     Wire pass throughs - (7.5 hours)       Category: Firewall
Located, drilled and deburred two pass throughs for electrical and oil cooler butterfly valve. Used safety wire through the wire nut to find a good location for cable pass thru. Also safety wired the fostener screws in the back plate of the FAB. Not my best work, but hard to get into that area.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.