Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1458.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Aug 11, 2022     Oil door and dipstick/coil pack interference - (2 hours)       Category: Firewall
Clecoed oil door in place on upper cowl and not super happy about the fit. Gonna need some adjustment there. Set upper cowl in place on the airplane and found I mounted the ElectroAir coil pack on the engine mount that interferes with the dipstick. Spent a bit of time trying to move the coil pack but ended up removing it and reinstalling. Can only secure the coil pack to the engine mount with 3 bolts and adel clamps. Need to find a way to secure the last corner. Always something.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.