Continued working on right inlet diffuser. Began by setting the vertical position of the right inlet diffuser with respect to the aluminum inlet ring. Used Bill Lanes recommendation of using styrofoam to align the ring and diffuser. Clamped and match drilled hole from inside diffuser. Removed the diffuser and drilled remaining holes for vertical support, then match drilled the last two vertical holes to the diffuser. Alignment looks good so far. Match drilled remaining holes form diffuser to horizontal angle on the front right baffle. Trimmed the last of the ramp on the right baffle that is covered by the inlet diffuser. Fabbed an 0.32 backer for the inside of the diffuser on the right side to support nut. Match drilled it to side wall of right diffuser. Fabbed and match drilled an 0.63 angle to bottom corner of baffle/diffuser.