Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1458.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Feb 21, 2021     Left forward baffle j bracket - (4 hours)       Category: Firewall
Fabricated another j bracket for the left forward baffle since I'm going with Bill Lanes plenum. His design requires modifications to the forward inlet baffles and supporting structures. Made paper template first, followed by a 0.32 pattern and finally an 0.50 bracket. A slow and methodical process with lots of trimming iterations.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.