Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1458.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Feb 09, 2021     Forward center baffles and trimming - (5 hours)       Category: Firewall
Began fabbing of forward center baffles using the templates from Bill Lane. I'm using the Sam James cowl with Bills plenum so I tried to modify the center left baffle from the Van's baffle kit. Had to bend the side of the baffle backward so I may have to make a new one out of 0.032 sheet, but this was good practice. Traced the template for the center left side too. Began the iterative process of trimming the rear and side baffles for the 1/2” spacing to the top cowl. Must've had the top cowl off and on 50 times trying to work my way down to the 1/2” spacing. Finished the day with the cowling on and no interference, so now it just needs the 1/2” spacing. Photos are shots through the cooling inlets and rear shot of right baffle through the oil door.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.