Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1458.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Feb 06, 2021     Camlock repair, Baffles and alt air door control arm - (5 hours)       Category: Firewall
Installed lower cowl to check alt air door arm and needed more trimming. Prob should have tried harder to place it on the vertical, but committed to bottom of FAB for now. Match drilled the last camlock hole that needed repair on bottom of lower cowl. Installed the floating receptacle and fits well now. Spent a lot of time trying to figure the engine baffles and modifications needed for Bill Lane plenum. Installed the aft baffles for number 3 and 4 cylinders after digging thru several hardware bags in firewall forward kit.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.